04/24/2020

01:41 PM Bug #16048 (Closed): MSA- Setup- Assign department menu is missing
Kiruthika G

04/23/2020

06:04 PM Bug #16031 (Resolved): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
Prabhu P
06:04 PM Bug #16030 (Resolved): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
Prabhu P
06:04 PM Bug #16025 (Resolved): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
Prabhu P
06:04 PM Bug #16022 (Resolved): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
Prabhu P
06:04 PM Bug #16021 (Resolved): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
Prabhu P
06:04 PM Bug #16020 (Resolved): Calibration: Unable to click the save button in calibration study
Prabhu P
06:04 PM Bug #16018 (Resolved): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
Prabhu P
06:04 PM Bug #16008 (Resolved): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
Prabhu P
06:04 PM Bug #15989 (Resolved): Holiday Enable: Kindly find the issue list in attached excel
Prabhu P
06:04 PM Bug #15969 (Resolved): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
Prabhu P
06:04 PM Bug #15966 (Resolved): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
Prabhu P
06:04 PM Bug #15959 (Resolved): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
Prabhu P
06:03 PM Bug #16048 (Resolved): MSA- Setup- Assign department menu is missing
Prabhu P
06:03 PM Bug #16045 (Resolved): Action: GRR(External Attribute) study is not showing in the action menu
Prabhu P
06:03 PM Bug #16044 (Resolved): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
Prabhu P
06:03 PM Bug #16043 (Resolved): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
Prabhu P
06:03 PM Bug #16042 (Resolved): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
Prabhu P
06:03 PM Bug #16039 (Resolved): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
Prabhu P
06:00 PM Bug #15956 (Resolved): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
Prabhu P
06:00 PM Bug #15927 (Resolved): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
Prabhu P
06:00 PM Bug #15926 (Resolved): Actions: Need to display the Linearity study details in action
Prabhu P
06:00 PM Bug #15922 (Resolved): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
Prabhu P
06:00 PM Bug #15920 (Resolved): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
Prabhu P
06:00 PM Bug #15919 (Resolved): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
Prabhu P
06:00 PM Bug #15918 (Resolved): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
Prabhu P
06:00 PM Bug #15908 (Resolved): Import-->Common-->Linearity is not handled in Gages import functionality
Prabhu P
06:00 PM Bug #15883 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client (UTC+08:00)Beijing related issue. Kindly refer description
Prabhu P
06:00 PM Bug #15882 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
06:00 PM Bug #15880 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
06:00 PM Bug #15848 (Resolved): VEM audit-Site name( NRPO-special economy zone)site) not listing in engagement model screen viewing form corporate(india ABO) site
Prabhu P
06:00 PM Bug #15846 (Resolved): VAM audit-Risks not added-Once the registration is completed,schedule audit icon not showing for VAM audiit as risks is not mandatory in supplier portal-Need notification for this
Prabhu P
06:00 PM Bug #15841 (Resolved): Gages: When tries to copy gage, the Work instruction of Gage type is getting deleted, but the Work instruction attachment is not getting deleted from the gage screen
Prabhu P
06:00 PM Bug #15835 (Resolved): Time Zone: External Lab calibration: The study date is showing wrongly in listing screen
Prabhu P
06:00 PM Bug #15830 (Resolved): Auditee name getting duplicated in vam&vem publish report(submit to auditee)
Prabhu P
06:00 PM Bug #15770 (Resolved): Sporadic issue-Though commodity name specified keep on displaying alert "Please specify commodity" upon saving
Prabhu P
06:00 PM Bug #15703 (Resolved): Supplier Report,commodity screen-If multiple BU have same SBU then sbu display duplicate.refer screen shot
Prabhu P
06:00 PM Bug #15702 (Resolved): In a multiple RBU if any few have same RSBU- unable to map in commodity screen
Prabhu P
06:00 PM Bug #15686 (Resolved): Commodity:No validation message for data dependencies.Able to edit/delete RBU,RSBU for a Commodity which has already used for previous audit
Prabhu P
06:00 PM Bug #15670 (Resolved): Unable to export VAM publish report in firefox
Prabhu P
06:00 PM Bug #15668 (Resolved): No option to create sub business unit in Business Unit master screen
Prabhu P
06:00 PM Bug #15664 (Resolved): View supply chain button is available for a supplier created from suite have no add part option
Prabhu P
06:00 PM Bug #15662 (Resolved): Unable to create supplier from Suite
Prabhu P
06:00 PM Bug #15585 (Resolved): TBD:Gaps in Cummins New import format 1.Need to add Reporting SubBusiness unit,2.Need to add multiple BU,SBU,RBU,RSBU
Prabhu P
06:00 PM Bug #15406 (Resolved): TBD:When the Risk value is set as Not qualified then it is allowing to schedule the audit and PPAP
Prabhu P
06:00 PM Bug #15241 (Resolved): Upon specifying the risk value of an Inactive risk description to a new risk value is not accepting,it shows risk value already exist
Prabhu P

04/22/2020

08:49 PM Bug #15691 (Closed): Gage Type: When a user tries to edit the discrimination value for Existing Gage type as 99.999999999, the Gage type screen is not loading
Kiruthika G
08:49 PM Bug #15694 (Closed): Gage: When entering the Least tolerance as "0.000025", the system taking the value as "0.00003". It should display the value as "0.000025"
Kiruthika G
08:48 PM Bug #15695 (Closed): Gages--> Import--> The 0.000095 value of least tolerance is not getting updated while importing, it displays error like "Error converting data type nvarchar to numeric."
Kiruthika G
08:48 PM Bug #15696 (Closed): Bias--> The least tolerance value of gage is shown like "2.5E-05". Refer screenshot
Kiruthika G
08:48 PM Bug #15698 (Closed): Calibration verification, Calibration, Bias, GRR(Varibale and Attribute) and Stability- Need tooltip for data entry field to view the entered value "n"numbers of decimal value.
Kiruthika G
08:48 PM Bug #15699 (Closed): GRR Variable--> When entering the value as "0.0000025655" in part field, after saving the data, it displays the value as "2.55E-06"
Kiruthika G
08:48 PM Bug #15700 (Closed): Gage(Attribute)--> The value of Lest tolerance is not updated in Least tolerance of GRR attribute study and calibration verification study
Kiruthika G
08:47 PM Bug #15701 (Closed): Calibration: If entering the value as "0.00000025" in Data entry field, while clicking on calculate button, the output value of average, bias and standard deviation shows as "2E-58".
Kiruthika G
08:47 PM Bug #15708 (Closed): Calibration: (Attribute and Variable) certificate--> The value of Least tolerance 0.0000025 is not getting properly updated in Certificate
Kiruthika G
08:47 PM Bug #15713 (Closed): External Lab calibration: Entered uncertainty value is added with Zero
Kiruthika G
08:47 PM Bug #15739 (Closed): Report: Gage list by status - The least tolerance value is not getting updated in Gage list by status
Kiruthika G
08:46 PM Bug #15741 (Closed): Stability: When using Lest tolerance value as "0.000025" in gage, in stability study the least tolerance showing the value as "3.5E-05"
Kiruthika G
08:46 PM Bug #15743 (Closed): Report--> List of measurement system and lab scope measurement--> The least tolerance not updated in list of measurement
Kiruthika G
08:46 PM Bug #15746 (Closed): Gage Type (Import) - When edit and save the imported gage type without giving the description field, it displays the alert like "Please specify description". In excel, it description field like optional
Kiruthika G
08:46 PM Bug #15748 (Closed): Gage: Attribute--> When importing the gage type(Without giving the information of Discrimination and UOM), the parameter name is not getting updated in gage type creating screen
Kiruthika G
08:45 PM Bug #15749 (Closed): Gage->Import--> Gage parameter--> When tries to import gage parameter with least tolerance value as "0.00001", it displays error message like "Error converting data type nvarchar to numeric".
Kiruthika G
08:45 PM Bug #15758 (Closed): Gage-->Import--> When imported gage status, the date of the gage is shown as "1-1-1900" and it displays multiple time in the gage listing screen
Kiruthika G
08:45 PM Bug #15801 (Closed): Gage Type(New and Existing): When entering the discrimination value as "99.999999999", it showing 99.999999988999 in gage type listing screen
Kiruthika G
08:45 PM Bug #15805 (Closed): Gage Type: Import--> when tries to import the same gage type, it showing error like "Incorrect syntax error;;"
Kiruthika G

04/16/2020

03:04 PM Bug #15630 (Closed): New Document Draft - On viewing the particular document for the first time Server Error throws. But not able to replicate.
verified in SP10.0.0 CY1 not replicated so closing the issue Anonymous
01:24 PM Bug #15642 (Closed): Date gets reduced to the previous day during publishing—Check by changing the time zone
Ragavi Ram
01:23 PM Bug #15642 (Fixed with Hotfix): Date gets reduced to the previous day during publishing—Check by changing the time zone
Ragavi Ram
01:23 PM Bug #15642: Date gets reduced to the previous day during publishing—Check by changing the time zone
Fixed in TOC , Closed in SP10.00 CY1 Ragavi Ram
01:23 PM Bug #15687 (Closed): Reference attachment - Not able to view the URL added in " The file is located at this URL" field
Closed in SP10.00 CY1 Ragavi Ram
01:23 PM Bug #15687 (Fixed with Hotfix): Reference attachment - Not able to view the URL added in " The file is located at this URL" field
Ragavi Ram
01:22 PM Bug #15688 (Closed): In the Approval Section, By opening and viewing the attached reference document its displaying an unwanted name in the Title Bar
Ragavi Ram
01:22 PM Bug #15688 (Fixed with Hotfix): In the Approval Section, By opening and viewing the attached reference document its displaying an unwanted name in the Title Bar
Closed in SP10.00 CY1 Ragavi Ram
01:10 PM Bug #15690 (Closed): New Document Request: Blank data displays in the below mentioned scenario
Closed in SP10.00 CY1 Ragavi Ram
01:10 PM Bug #15690 (Fixed with Hotfix): New Document Request: Blank data displays in the below mentioned scenario
Ragavi Ram
01:04 PM Bug #15893 (Closed): Not able to Create Route
Ragavi Ram
01:03 PM Bug #15893 (Fixed with Hotfix): Not able to Create Route
Closed in SP10.00 CY1 Ragavi Ram
01:03 PM Bug #15895 (Closed): Search field for Date is not working as expected in Actions and Administrator action page
Ragavi Ram
01:03 PM Bug #15895 (Fixed with Hotfix): Search field for Date is not working as expected in Actions and Administrator action page
Closed in SP10.00 CY1 Ragavi Ram
01:02 PM Bug #15902 (Closed): Not able to view the Status of the stritch documents from Show Document Download List . The page keeps loading
Ragavi Ram
01:02 PM Bug #15902 (Fixed with Hotfix): Not able to view the Status of the stritch documents from Show Document Download List . The page keeps loading
Closed in SP10.00 CY1 Ragavi Ram

04/06/2020

06:15 PM Bug #16102 (Closed): Calibration verification(Master- Variable and Attribute - inhouse) - The study is not showing in the action menu
Calibration verification(Gage - Variable and Attribute - inhouse) - The study is not showing in the action menu Kiruthika G
06:08 PM Bug #16099 (Closed): MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate details in Action menu calibration verification field

MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate det...
Kiruthika G
03:48 PM Bug #16078 (Closed): Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same.
Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same. Kiruthika G
11:46 AM Bug #16071 (Closed): Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is not getting updated in Certificate
Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is... Kiruthika G
11:26 AM Bug #16069 (Closed): Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current
Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current Kiruthika G

04/03/2020

07:16 PM Bug #15955 (Open): TIme zone behaviour
User Admin
07:16 PM Bug #15919 (Open): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
User Admin
07:16 PM Bug #15918 (Open): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
User Admin
07:16 PM Bug #16048 (Open): MSA- Setup- Assign department menu is missing
User Admin
11:41 AM Bug #16048 (Closed): MSA- Setup- Assign department menu is missing
MSA- Setup- Assign department menu is missing Kiruthika G
07:16 PM Bug #16045 (Open): Action: GRR(External Attribute) study is not showing in the action menu
User Admin
07:16 PM Bug #16044 (Open): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
User Admin
07:16 PM Bug #16043 (Open): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
User Admin
07:16 PM Bug #16042 (Open): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
User Admin
07:16 PM Bug #16039 (Open): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
User Admin
07:16 PM Bug #16031 (Open): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
User Admin
07:16 PM Bug #16030 (Open): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
User Admin
07:16 PM Bug #16025 (Open): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
User Admin
07:16 PM Bug #16022 (Open): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
User Admin
07:16 PM Bug #16021 (Open): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
User Admin
07:16 PM Bug #16020 (Open): Calibration: Unable to click the save button in calibration study
User Admin
07:16 PM Bug #16018 (Open): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
User Admin
07:16 PM Bug #16008 (Open): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
User Admin
07:16 PM Bug #15989 (Open): Holiday Enable: Kindly find the issue list in attached excel
User Admin
07:16 PM Bug #15969 (Open): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
User Admin
07:16 PM Bug #15966 (Open): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
User Admin
07:16 PM Bug #15959 (Open): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
User Admin
07:16 PM Bug #15956 (Open): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
User Admin
07:16 PM Bug #15927 (Open): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
User Admin
07:16 PM Bug #15926 (Open): Actions: Need to display the Linearity study details in action
User Admin
07:16 PM Bug #15922 (Open): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
User Admin
07:16 PM Bug #15920 (Open): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
User Admin
10:42 AM Bug #15913 (Resolved): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
Prabhu P
10:42 AM Bug #15912 (Resolved): Time Zone(subtract date - disabled): Central Time Zone - China: Stability(dd/mm)--> The study date is getting updated in last study date, received date, study date. So that the due date is changing wherever hitting the save button
Prabhu P
10:42 AM Bug #15911 (Resolved): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
Prabhu P
10:42 AM Bug #15909 (Resolved): Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05"
Prabhu P
10:42 AM Bug #15907 (Resolved): External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibration study. Kindly provide validation
Prabhu P
10:42 AM Bug #15904 (Resolved): Doc pro - MSA: Business Rule--> Reset the Docpro level-->Linearity--> While publishing the linearity study, it not published under the same path(Gage Number), it published under the different Gage Number
Prabhu P
10:42 AM Bug #15901 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15891 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15890 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15888 (Resolved): Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be published"
Prabhu P
10:42 AM Bug #15884 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15855 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15853 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15845 (Resolved): Gage: As of date is getting changed, once the external lab calibration is done for selected gage
Prabhu P
10:42 AM Bug #15840 (Resolved): Gages: When changing the Frequency as days to Month and Month to day, the due date is getting changed without having the Last study date
Prabhu P
10:42 AM Bug #15839 (Resolved): Gage(YYYY-MM-DD): Unable to save the Gages
Prabhu P
10:42 AM Bug #15838 (Resolved): Gages: Advance search--> Department name is not showing for the some of the gages
Prabhu P
10:42 AM Bug #15836 (Resolved): Common: When login as MSA adminitrator, the landing screen is not showing properly
Prabhu P
10:42 AM Bug #15827 (Resolved): Time Zone(Server date)Calibration verification: The next due date of calibration is not showing in the study
Prabhu P
10:42 AM Bug #15826 (Resolved): Time Zone(Server date)All study: When the date format is "dd/mm/yyyy", while selecting the study date as "1-2-2020" for 1 month frequency, the next due date is showing like "3-01-2020"
Prabhu P
10:42 AM Bug #15825 (Resolved): Time Zone:(Server date)All study: When picking the study date as "2020-03-05" for "1" month frequency, it showing the Next calibration date as "2025-11-04". Kindly refer screenshots
Prabhu P
10:42 AM Bug #15742 (Resolved): MSA Calendar: When clicking on view more icon, the page is not loading
Prabhu P
10:41 AM Bug #15914 (Resolved): Multi Language: MSA multi language issue list. Please refer Excel sheet
Prabhu P
10:40 AM Bug #15916 (Resolved): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
Prabhu P

04/02/2020

09:33 PM Bug #16045 (Closed): Action: GRR(External Attribute) study is not showing in the action menu
Action: GRR(External Attribute) study is not showing in the action menu Kiruthika G
09:30 PM Bug #16044 (Closed): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date fo... Kiruthika G
09:02 PM Bug #16043 (Closed): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the ... Kiruthika G
08:40 PM Bug #16042 (Closed): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
MSA Calendar: GRR--> When clicking on the study, it is not getting loaded Kiruthika G
07:27 PM Bug #16039 (Closed): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
Master(Inhouse and External Lab), Variable& Attribute- (External Lab)-->(Calibration verification - External and Inho... Kiruthika G
04:10 PM Bug #16031 (Closed): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
Calibration: Multi parameter, the minimum date is not showing in the grid Kiruthika G

04/01/2020

08:25 PM Bug #16030 (Closed): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the acti... Kiruthika G
12:53 PM Bug #16025 (Closed): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
Issue 1: Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of ... Kiruthika G

03/31/2020

04:42 PM Bug #16022 (Closed): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is ... Kiruthika G
03:24 PM Bug #16021 (Closed): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the doc... Kiruthika G
01:16 PM Bug #16020 (Closed): Calibration: Unable to click the save button in calibration study
Calibration: Unable to click the save button in calibration study Kiruthika G
12:18 PM Bug #16018 (Closed): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field Kiruthika G
 