Activity
From 04/23/2020 to 05/22/2020
05/12/2020
- 06:22 PM Bug #15904 (Closed): Doc pro - MSA: Business Rule--> Reset the Docpro level-->Linearity--> While publishing the linearity study, it not published under the same path(Gage Number), it published under the different Gage Number
- 07:54 AM Bug #16031 (Not Resolved): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
- 07:53 AM Bug #16025 (Not Resolved): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
- 07:50 AM Bug #16008 (Closed): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
- 07:50 AM Bug #15959 (Not Resolved): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
- 07:47 AM Bug #15918 (Closed): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
- 07:45 AM Bug #15916 (Closed): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
- 07:45 AM Bug #15913 (Closed): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
- 07:43 AM Bug #15912 (Closed): Time Zone(subtract date - disabled): Central Time Zone - China: Stability(dd/mm)--> The study date is getting updated in last study date, received date, study date. So that the due date is changing wherever hitting the save button
- 07:41 AM Bug #15911 (Closed): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
- 07:27 AM Bug #15891 (Closed): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 07:20 AM Bug #15884 (Closed): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 07:18 AM Bug #15855 (Closed): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 07:06 AM Bug #15853 (Closed): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 07:00 AM Bug #15835 (Closed): Time Zone: External Lab calibration: The study date is showing wrongly in listing screen
- 06:59 AM Bug #15826 (Closed): Time Zone(Server date)All study: When the date format is "dd/mm/yyyy", while selecting the study date as "1-2-2020" for 1 month frequency, the next due date is showing like "3-01-2020"
- 06:53 AM Bug #15825 (Closed): Time Zone:(Server date)All study: When picking the study date as "2020-03-05" for "1" month frequency, it showing the Next calibration date as "2025-11-04". Kindly refer screenshots
05/11/2020
- 08:19 PM Bug #16039 (Not Resolved): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
- 07:26 PM Bug #16045 (Closed): Action: GRR(External Attribute) study is not showing in the action menu
05/04/2020
- 09:16 PM Bug #16069 (Closed): Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current
- 09:16 PM Bug #16069 (Fixed with Hotfix): Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current
- 09:15 PM Bug #16045 (Yet to Verify): Action: GRR(External Attribute) study is not showing in the action menu
- 09:15 PM Bug #16044 (Yet to Verify): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
- 09:15 PM Bug #16043 (Closed): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
- 09:13 PM Bug #16042 (Closed): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
- 09:12 PM Bug #16031 (Yet to Verify): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
- 09:12 PM Bug #16030 (Yet to Verify): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
- 09:11 PM Bug #16025 (Yet to Verify): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
- 09:10 PM Bug #16022 (Yet to Verify): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
- 09:09 PM Bug #16021 (Yet to Verify): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
- 09:09 PM Bug #16020 (Closed): Calibration: Unable to click the save button in calibration study
- 09:09 PM Bug #16018 (Closed): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
- 09:09 PM Bug #16008 (Yet to Verify): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
- 09:08 PM Bug #15989 (Closed): Holiday Enable: Kindly find the issue list in attached excel
- 09:07 PM Bug #15969 (Not Resolved): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
- 09:06 PM Bug #15966 (Closed): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
- 08:53 PM Bug #15956 (Yet to Verify): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
- 08:53 PM Bug #15927 (Closed): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
- 08:49 PM Bug #15922 (Yet to Verify): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
- 08:49 PM Bug #15920 (Yet to Verify): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
- 08:49 PM Bug #15919 (Yet to Verify): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
- 08:48 PM Bug #15918 (Yet to Verify): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
- 08:48 PM Bug #15916 (Yet to Verify): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
- 08:47 PM Bug #15913 (Yet to Verify): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
- 08:45 PM Bug #15911 (Yet to Verify): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
- 08:44 PM Bug #15909 (Closed): Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05"
- 08:42 PM Bug #15907 (Not Resolved): External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibration study. Kindly provide validation
- 08:40 PM Bug #15908 (Not Resolved): Import-->Common-->Linearity is not handled in Gages import functionality
- 08:38 PM Bug #15901 (Not Resolved): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
- 08:35 PM Bug #15891 (Yet to Verify): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 08:35 PM Bug #15890 (Yet to Verify): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 08:35 PM Bug #15888 (Closed): Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be published"
- 08:35 PM Bug #15884 (Yet to Verify): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 08:34 PM Bug #15855 (Yet to Verify): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 08:34 PM Bug #15853 (Yet to Verify): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 08:34 PM Bug #15845 (Closed): Gage: As of date is getting changed, once the external lab calibration is done for selected gage
- 08:34 PM Bug #15841 (Not Resolved): Gages: When tries to copy gage, the Work instruction of Gage type is getting deleted, but the Work instruction attachment is not getting deleted from the gage screen
- 08:31 PM Bug #15840 (Closed): Gages: When changing the Frequency as days to Month and Month to day, the due date is getting changed without having the Last study date
- 08:30 PM Bug #15839 (Closed): Gage(YYYY-MM-DD): Unable to save the Gages
- 08:28 PM Bug #15838 (Closed): Gages: Advance search--> Department name is not showing for the some of the gages
- 08:28 PM Bug #15836 (Closed): Common: When login as MSA adminitrator, the landing screen is not showing properly
- 08:27 PM Bug #15835 (Yet to Verify): Time Zone: External Lab calibration: The study date is showing wrongly in listing screen
- 08:27 PM Bug #15827 (Closed): Time Zone(Server date)Calibration verification: The next due date of calibration is not showing in the study
- 08:26 PM Bug #15826 (Yet to Verify): Time Zone(Server date)All study: When the date format is "dd/mm/yyyy", while selecting the study date as "1-2-2020" for 1 month frequency, the next due date is showing like "3-01-2020"
- 08:26 PM Bug #15825 (Yet to Verify): Time Zone:(Server date)All study: When picking the study date as "2020-03-05" for "1" month frequency, it showing the Next calibration date as "2025-11-04". Kindly refer screenshots
- 08:25 PM Bug #15742 (Closed): MSA Calendar: When clicking on view more icon, the page is not loading
- 08:25 PM Bug #15738 (Closed): Calibration(Attribute and Variable): The trail value of calibration study is displays as "2.58E-06" in chart
04/30/2020
- 07:32 PM Bug #15926 (Not Resolved): Actions: Need to display the Linearity study details in action
- 07:29 PM Bug #16102 (Open): Calibration verification(Master- Variable and Attribute - inhouse) - The study is not showing in the action menu
- 07:29 PM Bug #16099 (Open): MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate details in Action menu calibration verification field
- 07:29 PM Bug #16078 (Open): Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same.
- 07:29 PM Bug #16071 (Open): Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is not getting updated in Certificate
- 07:29 PM Bug #16069 (Open): Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current
04/24/2020
04/23/2020
- 06:04 PM Bug #16031 (Resolved): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
- 06:04 PM Bug #16030 (Resolved): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
- 06:04 PM Bug #16025 (Resolved): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
- 06:04 PM Bug #16022 (Resolved): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
- 06:04 PM Bug #16021 (Resolved): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
- 06:04 PM Bug #16020 (Resolved): Calibration: Unable to click the save button in calibration study
- 06:04 PM Bug #16018 (Resolved): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
- 06:04 PM Bug #16008 (Resolved): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
- 06:04 PM Bug #15989 (Resolved): Holiday Enable: Kindly find the issue list in attached excel
- 06:04 PM Bug #15969 (Resolved): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
- 06:04 PM Bug #15966 (Resolved): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
- 06:04 PM Bug #15959 (Resolved): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
- 06:03 PM Bug #16048 (Resolved): MSA- Setup- Assign department menu is missing
- 06:03 PM Bug #16045 (Resolved): Action: GRR(External Attribute) study is not showing in the action menu
- 06:03 PM Bug #16044 (Resolved): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
- 06:03 PM Bug #16043 (Resolved): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
- 06:03 PM Bug #16042 (Resolved): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
- 06:03 PM Bug #16039 (Resolved): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
- 06:00 PM Bug #15956 (Resolved): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
- 06:00 PM Bug #15927 (Resolved): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
- 06:00 PM Bug #15926 (Resolved): Actions: Need to display the Linearity study details in action
- 06:00 PM Bug #15922 (Resolved): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
- 06:00 PM Bug #15920 (Resolved): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
- 06:00 PM Bug #15919 (Resolved): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
- 06:00 PM Bug #15918 (Resolved): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
- 06:00 PM Bug #15908 (Resolved): Import-->Common-->Linearity is not handled in Gages import functionality
- 06:00 PM Bug #15883 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client (UTC+08:00)Beijing related issue. Kindly refer description
- 06:00 PM Bug #15882 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 06:00 PM Bug #15880 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- 06:00 PM Bug #15848 (Resolved): VEM audit-Site name( NRPO-special economy zone)site) not listing in engagement model screen viewing form corporate(india ABO) site
- 06:00 PM Bug #15846 (Resolved): VAM audit-Risks not added-Once the registration is completed,schedule audit icon not showing for VAM audiit as risks is not mandatory in supplier portal-Need notification for this
- 06:00 PM Bug #15841 (Resolved): Gages: When tries to copy gage, the Work instruction of Gage type is getting deleted, but the Work instruction attachment is not getting deleted from the gage screen
- 06:00 PM Bug #15835 (Resolved): Time Zone: External Lab calibration: The study date is showing wrongly in listing screen
- 06:00 PM Bug #15830 (Resolved): Auditee name getting duplicated in vam&vem publish report(submit to auditee)
- 06:00 PM Bug #15770 (Resolved): Sporadic issue-Though commodity name specified keep on displaying alert "Please specify commodity" upon saving
- 06:00 PM Bug #15703 (Resolved): Supplier Report,commodity screen-If multiple BU have same SBU then sbu display duplicate.refer screen shot
- 06:00 PM Bug #15702 (Resolved): In a multiple RBU if any few have same RSBU- unable to map in commodity screen
- 06:00 PM Bug #15686 (Resolved): Commodity:No validation message for data dependencies.Able to edit/delete RBU,RSBU for a Commodity which has already used for previous audit
- 06:00 PM Bug #15670 (Resolved): Unable to export VAM publish report in firefox
- 06:00 PM Bug #15668 (Resolved): No option to create sub business unit in Business Unit master screen
- 06:00 PM Bug #15664 (Resolved): View supply chain button is available for a supplier created from suite have no add part option
- 06:00 PM Bug #15662 (Resolved): Unable to create supplier from Suite
- 06:00 PM Bug #15585 (Resolved): TBD:Gaps in Cummins New import format 1.Need to add Reporting SubBusiness unit,2.Need to add multiple BU,SBU,RBU,RSBU
- 06:00 PM Bug #15406 (Resolved): TBD:When the Risk value is set as Not qualified then it is allowing to schedule the audit and PPAP
- 06:00 PM Bug #15241 (Resolved): Upon specifying the risk value of an Inactive risk description to a new risk value is not accepting,it shows risk value already exist
Also available in: Atom