Project

General

Profile

Activity

From 03/15/2020 to 04/13/2020

04/06/2020

06:15 PM Bug #16102 (Closed): Calibration verification(Master- Variable and Attribute - inhouse) - The study is not showing in the action menu
Calibration verification(Gage - Variable and Attribute - inhouse) - The study is not showing in the action menu Kiruthika G
06:08 PM Bug #16099 (Closed): MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate details in Action menu calibration verification field

MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate det...
Kiruthika G
03:48 PM Bug #16078 (Closed): Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same.
Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same. Kiruthika G
11:46 AM Bug #16071 (Closed): Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is not getting updated in Certificate
Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is... Kiruthika G
11:26 AM Bug #16069 (Closed): Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current
Common: Multi parameter: When tries to select the another parameter, it does not shows the Received date as current Kiruthika G

04/03/2020

07:16 PM Bug #15955 (Open): TIme zone behaviour
User Admin
07:16 PM Bug #15919 (Open): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
User Admin
07:16 PM Bug #15918 (Open): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
User Admin
07:16 PM Bug #16048 (Open): MSA- Setup- Assign department menu is missing
User Admin
11:41 AM Bug #16048 (Closed): MSA- Setup- Assign department menu is missing
MSA- Setup- Assign department menu is missing Kiruthika G
07:16 PM Bug #16045 (Open): Action: GRR(External Attribute) study is not showing in the action menu
User Admin
07:16 PM Bug #16044 (Open): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
User Admin
07:16 PM Bug #16043 (Open): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
User Admin
07:16 PM Bug #16042 (Open): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
User Admin
07:16 PM Bug #16039 (Open): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
User Admin
07:16 PM Bug #16031 (Open): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
User Admin
07:16 PM Bug #16030 (Open): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
User Admin
07:16 PM Bug #16025 (Open): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
User Admin
07:16 PM Bug #16022 (Open): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
User Admin
07:16 PM Bug #16021 (Open): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
User Admin
07:16 PM Bug #16020 (Open): Calibration: Unable to click the save button in calibration study
User Admin
07:16 PM Bug #16018 (Open): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
User Admin
07:16 PM Bug #16008 (Open): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
User Admin
07:16 PM Bug #15989 (Open): Holiday Enable: Kindly find the issue list in attached excel
User Admin
07:16 PM Bug #15969 (Open): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
User Admin
07:16 PM Bug #15966 (Open): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
User Admin
07:16 PM Bug #15959 (Open): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
User Admin
07:16 PM Bug #15956 (Open): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
User Admin
07:16 PM Bug #15927 (Open): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
User Admin
07:16 PM Bug #15926 (Open): Actions: Need to display the Linearity study details in action
User Admin
07:16 PM Bug #15922 (Open): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
User Admin
07:16 PM Bug #15920 (Open): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
User Admin
10:42 AM Bug #15913 (Resolved): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
Prabhu P
10:42 AM Bug #15912 (Resolved): Time Zone(subtract date - disabled): Central Time Zone - China: Stability(dd/mm)--> The study date is getting updated in last study date, received date, study date. So that the due date is changing wherever hitting the save button
Prabhu P
10:42 AM Bug #15911 (Resolved): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
Prabhu P
10:42 AM Bug #15909 (Resolved): Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05"
Prabhu P
10:42 AM Bug #15907 (Resolved): External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibration study. Kindly provide validation
Prabhu P
10:42 AM Bug #15904 (Resolved): Doc pro - MSA: Business Rule--> Reset the Docpro level-->Linearity--> While publishing the linearity study, it not published under the same path(Gage Number), it published under the different Gage Number
Prabhu P
10:42 AM Bug #15901 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15891 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15890 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15888 (Resolved): Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be published"
Prabhu P
10:42 AM Bug #15884 (Resolved): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15855 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15853 (Resolved): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Prabhu P
10:42 AM Bug #15845 (Resolved): Gage: As of date is getting changed, once the external lab calibration is done for selected gage
Prabhu P
10:42 AM Bug #15840 (Resolved): Gages: When changing the Frequency as days to Month and Month to day, the due date is getting changed without having the Last study date
Prabhu P
10:42 AM Bug #15839 (Resolved): Gage(YYYY-MM-DD): Unable to save the Gages
Prabhu P
10:42 AM Bug #15838 (Resolved): Gages: Advance search--> Department name is not showing for the some of the gages
Prabhu P
10:42 AM Bug #15836 (Resolved): Common: When login as MSA adminitrator, the landing screen is not showing properly
Prabhu P
10:42 AM Bug #15827 (Resolved): Time Zone(Server date)Calibration verification: The next due date of calibration is not showing in the study
Prabhu P
10:42 AM Bug #15826 (Resolved): Time Zone(Server date)All study: When the date format is "dd/mm/yyyy", while selecting the study date as "1-2-2020" for 1 month frequency, the next due date is showing like "3-01-2020"
Prabhu P
10:42 AM Bug #15825 (Resolved): Time Zone:(Server date)All study: When picking the study date as "2020-03-05" for "1" month frequency, it showing the Next calibration date as "2025-11-04". Kindly refer screenshots
Prabhu P
10:42 AM Bug #15742 (Resolved): MSA Calendar: When clicking on view more icon, the page is not loading
Prabhu P
10:41 AM Bug #15914 (Resolved): Multi Language: MSA multi language issue list. Please refer Excel sheet
Prabhu P
10:40 AM Bug #15916 (Resolved): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
Prabhu P

04/02/2020

09:33 PM Bug #16045 (Closed): Action: GRR(External Attribute) study is not showing in the action menu
Action: GRR(External Attribute) study is not showing in the action menu Kiruthika G
09:30 PM Bug #16044 (Closed): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date fo... Kiruthika G
09:02 PM Bug #16043 (Closed): Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the alert "This Gage does not have Least Tolerance info for all parameters as the gage type" for attribute, the least tolerance is optional
Gages-->Attribute--> Without least tolerance--> When tries to conduct the study for selected gage, it is showing the ... Kiruthika G
08:40 PM Bug #16042 (Closed): MSA Calendar: GRR--> When clicking on the study, it is not getting loaded
MSA Calendar: GRR--> When clicking on the study, it is not getting loaded Kiruthika G
07:27 PM Bug #16039 (Closed): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
Master(Inhouse and External Lab), Variable& Attribute- (External Lab)-->(Calibration verification - External and Inho... Kiruthika G
04:10 PM Bug #16031 (Closed): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
Calibration: Multi parameter, the minimum date is not showing in the grid Kiruthika G

04/01/2020

08:25 PM Bug #16030 (Closed): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the acti... Kiruthika G
12:53 PM Bug #16025 (Closed): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
Issue 1: Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of ... Kiruthika G

03/31/2020

04:42 PM Bug #16022 (Closed): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is ... Kiruthika G
03:24 PM Bug #16021 (Closed): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the doc... Kiruthika G
01:16 PM Bug #16020 (Closed): Calibration: Unable to click the save button in calibration study
Calibration: Unable to click the save button in calibration study Kiruthika G
12:18 PM Bug #16018 (Closed): Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field
Master: Last study date is not getting updated in Calibration, Linearity and Calibration verification field Kiruthika G

03/30/2020

12:57 PM Bug #16008 (Closed): Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the study
Time Zone:(Central - IST): When selecting Last study date the next due date is not showing automatically for all the ... Kiruthika G

03/26/2020

06:45 PM Bug #15989 (Closed): Holiday Enable: Kindly find the issue list in attached excel
Holiday Enable: Kindly find the issue list in attached excel Kiruthika G

03/25/2020

04:57 PM Bug #15969 (Closed): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
Calibration verification --> if the last study date is current date, it allows user to select and save the past date.... Kiruthika G
04:01 PM Bug #15966 (Closed): Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field
Gages-->Attribute/Variable--> The last study date of calibration study date is getting updating in the as of date field Kiruthika G
01:20 PM Bug #15959 (Closed): Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field
Issue 1: Master: When selecting the last study date for Linearity and Calibration verification, while clicking on sav... Kiruthika G
12:32 PM Bug #15956 (Closed): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user d... Kiruthika G
11:32 AM Bug #15955 (Open): TIme zone behaviour
There are 2 different cases faced during time zone verification
Case 1:
If the Time Zone updated in the system to(U...
malini C

03/23/2020

04:10 PM Bug #15927 (Closed): GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, Observe the screen.
Issue 1: GRR (Variable)--> When selecting the Include with in Part Variation is "YES" and click on Generate button, ... Kiruthika G
04:06 PM Bug #15926 (Closed): Actions: Need to display the Linearity study details in action
Actions: Need to display the Linearity study details in action Kiruthika G
01:49 PM Bug #15922 (Closed): Time Zone(Eastern -Eastern & Eastern - Central)(Subtract date -disabled - all date format) Gages, Master and All the study --> When selecting the date as March 1st to March 8th, the next due date is showing wrong. Refer video
Issue 1: Time Zone(Eastern -Eastern Subtract date -disabled - all date format) Gages, Master and All the study --> W... Kiruthika G
12:52 PM Bug #15920 (Closed): Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
Issue 1: Time Zone(Eastern - Central)-DD/MM(Subtract date is disabled)- Gages --> The Next due date is showing wrong
...
Kiruthika G
12:31 PM Bug #15919 (Closed): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date.
Whe...
Kiruthika G

03/20/2020

03:54 PM Bug #15918 (Closed): Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date is getting changed whenever hitting the save button.
Issue 1: Time Zone:(All central - IST, Central- China, Central - Eastern and Central - Central)Gage: The as of date ... Kiruthika G
01:25 PM Bug #15916 (Open): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
Smitha V
12:51 PM Bug #15916 (Closed): Time Zone(Central Time US& Canada - IST YYYY/MM/DD)External lab calibration--> The study done date is not showing in the gird.(Here it is showing the next date)
Time Zone(Central Time US& Canada - IST)External lab calibration--> The study done date is not showing in the gird.(H... Kiruthika G
01:25 PM Bug #15915 (Open): Multi Language: TPM Multi language issue list. Please refer the attached excel sheet
Smitha V
01:25 PM Bug #15914 (Open): Multi Language: MSA multi language issue list. Please refer Excel sheet
Smitha V
01:25 PM Bug #15913 (Open): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
Smitha V
01:25 PM Bug #15912 (Open): Time Zone(subtract date - disabled): Central Time Zone - China: Stability(dd/mm)--> The study date is getting updated in last study date, received date, study date. So that the due date is changing wherever hitting the save button
Smitha V
01:25 PM Bug #15911 (Open): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
Smitha V
01:25 PM Bug #15909 (Open): Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05"
Smitha V
01:25 PM Bug #15908 (Open): Import-->Common-->Linearity is not handled in Gages import functionality
Smitha V
01:25 PM Bug #15907 (Open): External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibration study. Kindly provide validation
Smitha V
01:25 PM Bug #15905 (Open): TOC: Native documents are showing as white color , when hovering it shows green color
Smitha V
01:25 PM Bug #15904 (Open): Doc pro - MSA: Business Rule--> Reset the Docpro level-->Linearity--> While publishing the linearity study, it not published under the same path(Gage Number), it published under the different Gage Number
Smitha V
01:25 PM Bug #15902 (Open): Not able to view the Status of the stritch documents from Show Document Download List . The page keeps loading
Smitha V
01:25 PM Bug #15901 (Open): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15895 (Open): Search field for Date is not working as expected in Actions and Administrator action page
Smitha V
01:25 PM Bug #15893 (Open): Not able to Create Route
Smitha V
01:25 PM Bug #15891 (Open): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15890 (Open): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15888 (Open): Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be published"
Smitha V
01:25 PM Bug #15884 (Open): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15883 (Open): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client (UTC+08:00)Beijing related issue. Kindly refer description
Smitha V
01:25 PM Bug #15882 (Open): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15880 (Open): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15878 (Open): VEM audit-Social media login (supplier contact)-Switching from one site to another page has not properly refreshed and loaded with corresponding site
Smitha V
01:25 PM Bug #15877 (Open): VEM audit-Unable to resubmit corrective action response by an auditee(supplier contact) after auditor has rejected the audit.(Submit button is missing) in CAR publish page
Smitha V
01:25 PM Bug #15855 (Open): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V
01:25 PM Bug #15853 (Open): Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Smitha V

03/19/2020

06:41 PM Bug #15915 (Open): Multi Language: TPM Multi language issue list. Please refer the attached excel sheet
Multi Language: TPM Multi language issue list. Please refer the attached excel sheet Kiruthika G
06:40 PM Bug #15914 (Closed): Multi Language: MSA multi language issue list. Please refer Excel sheet
Multi Language: MSA multi language issue list. Please refer Excel sheet Kiruthika G
05:38 PM Bug #15913 (Closed): Time Zone(Central-China)-Subtract- Disabled: GRR->unable to calculate the value when the option is in Show Crossed GRR Analysis and Show Nested GRR Analysis
Time Zone(Central-China)-Subtract- Disabled: Stability-->unable to calculate the value when the option is in Show Cro... Kiruthika G
05:27 PM Bug #15912 (Closed): Time Zone(subtract date - disabled): Central Time Zone - China: Stability(dd/mm)--> The study date is getting updated in last study date, received date, study date. So that the due date is changing wherever hitting the save button
Time Zone(subtract date - disabled): Central Time Zone - China: Stability--> The study date is getting updated in las... Kiruthika G
03:13 PM Bug #15911 (Closed): Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but the study date which is showing in the listing screen displays one day after
Time Zone(Subtract date -Disabled)--> Central Time -Chinav--> All study--> The next due date is showing properly, but... Kiruthika G
12:12 PM Bug #15909 (Closed): Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05"
Calibration: Least tolerance field which is in data entry screen, it shows the value of 0.000025 as "3E-05" Kiruthika G
11:56 AM Bug #15908 (Closed): Import-->Common-->Linearity is not handled in Gages import functionality
Import-->Common-->Linearity is not handled in Gages import functionality
As per development comment: It will handl...
Kiruthika G

03/18/2020

07:10 PM Bug #15801 (Fixed with Hotfix): Gage Type(New and Existing): When entering the discrimination value as "99.999999999", it showing 99.999999988999 in gage type listing screen
Kiruthika G
07:10 PM Bug #15698 (Fixed with Hotfix): Calibration verification, Calibration, Bias, GRR(Varibale and Attribute) and Stability- Need tooltip for data entry field to view the entered value "n"numbers of decimal value.
Kiruthika G
06:43 PM Bug #15907 (Closed): External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibration study. Kindly provide validation
External Lab calibration: Without selecting the approver field, user can able to complete the external lab calibratio... Kiruthika G
04:53 PM Bug #15905 (Open): TOC: Native documents are showing as white color , when hovering it shows green color
TOC: Native documents are showing as white color , when hovering it shows green color Anonymous
03:54 PM Bug #15904 (Closed): Doc pro - MSA: Business Rule--> Reset the Docpro level-->Linearity--> While publishing the linearity study, it not published under the same path(Gage Number), it published under the different Gage Number
Doc pro - MSA: Business Rule--> Reset the Docpro level--> Linearity-->While publishing the linearity study, it not pu... Kiruthika G
01:11 PM Bug #15656 (Closed): Reports-Adherence Report-VEM audit-If an audit has updated with new date then it is not showing in the report
Closing this defect as it is working as expected Saradha Balan
01:11 PM Bug #15655 (Closed): Reports-Adherence Report-VEM audit-If an audit contains two commodities then only one commodity is alone showing in report
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15847 (Closed): Cummins-VAM audit-Scheduled audit from corporate to different site has not listed to VQI
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15832 (Closed): Multi site-Email is not working for routine audit
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15831 (Closed): escalation mail for before/after due-mail-If 1 nc and 1 OFI uploaded only 1 nc uploaded context displaying but details shows both
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15823 (Closed): Both reminder and escalation(enabled)-Business rule and Suite Route has set up -Escalation setting frequency wise not working
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15822 (Closed): Business Rule-Reminder set up-Confirmed audit-Reminder for conducting an audit-context is mismatch (for after due date it shows before due date)
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15821 (Closed): Business Rule-Reminder set up-• Tentative-Reminder for auditor/auditee availability confirmation email
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15819 (Closed): VAM-Escalation for NC, Close out emails still displays in batch manager even after closed out the VAM audit
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15818 (Closed): Escalation set up • Escalation only set up -when running R2 ,emails sent to R3 users also
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15733 (Closed): Supplier Report-If commodity have only BU and no Sub BU then all the report related to commodity not showing the details properly
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15717 (Closed): BU report-Sub BU not showing correct for the BU
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15711 (Closed): Supplier Report-Mapping structure report-Commodity listing lissue(filter issue)
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15706 (Closed): Audit score report-SCAR value shows wrong
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15705 (Closed): Label for Adherence,process audit report mismatch between menu and in report heading
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15704 (Closed): VEM engagement model screen-Audit calender--Clicking on audit from calendar no details showing in update/delete page
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15685 (Closed): Supplier Report-Audit score Report-Though no nc raised while performing VEM in audit report it shows 1 in Red
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15684 (Closed): Supplier Report-Audit score report-Score shows mismatch between audit report and audit performed.Refer screen shot
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15683 (Closed): Supplier Reports-Based on the filter report is not showing instead it is showing all the data
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15682 (Closed): Supplier Report-Reports showing both VAm and VEM reports instead it should show only VEM reports
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15681 (Closed): Supplier Report-Site specific filter is not available.Report shows data from all the sites related to filter
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15680 (Closed): VEM audit calender-Tentative event audit unable to confirm using update option as on clicking audit the details not getting loaded
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15679 (Closed): There is no alert to notify map segment has not mapped to audit program.During VEM audit schedule "Schedule created" alert has displayed but no audit generated because of not mapping segment
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15678 (Closed): Supplier Report:Report shows only commodity audits not showing audit done for parts mapped to those commodity
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15677 (Closed): Supplier Report:SQIE not listing auditor name specific to audit instead it shows all SQI assigned for the supplier
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15666 (Closed): Unable to delete schedule audit from update/delete schedule audit page
Closing this defect as it is working as expected Saradha Balan
01:10 PM Bug #15665 (Closed): Audit scheduled from corporate for different site not listing in corresponding site perform audit page
Closing this defect as it is working as expected Saradha Balan
01:08 PM Bug #15849 (Closed): VEM-Event Audit-Unable to create event audit as "Please select audit type" alert is keep on displaying.(no map segment)
Closing this defect Saradha Balan

03/17/2020

05:29 PM Bug #15902 (Closed): Not able to view the Status of the stritch documents from Show Document Download List . The page keeps loading
Not able to view the Status of the stritch documents from Show Document Download List . The page keeps loading Ragavi Ram
04:53 PM Bug #15901 (Closed): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
All the Study: When tries to select the due date as "17-3-2020" the next due date is showing as "16-04-2020".
Whil...
Kiruthika G
02:13 PM Bug #15895 (Closed): Search field for Date is not working as expected in Actions and Administrator action page
Search field for Date is not working as expected in Actions and Administrator action page Ragavi Ram
01:38 PM Bug #15893 (Closed): Not able to Create Route
Not able to set position based route in creation Ragavi Ram
12:19 PM Bug #15891 (Closed): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Gage: As of date is getting changed while saving the gage details Kiruthika G
11:50 AM Bug #15890 (Closed): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
Bias, Calibration verification, External lab calibration and stability --> While conducting the study with the date o... Kiruthika G
11:38 AM Bug #15656 (Resolved): Reports-Adherence Report-VEM audit-If an audit has updated with new date then it is not showing in the report
Nikhil d
11:38 AM Bug #15655 (Resolved): Reports-Adherence Report-VEM audit-If an audit contains two commodities then only one commodity is alone showing in report
Nikhil d
11:37 AM Bug #15679 (Resolved): There is no alert to notify map segment has not mapped to audit program.During VEM audit schedule "Schedule created" alert has displayed but no audit generated because of not mapping segment
Nikhil d
11:37 AM Bug #15679: There is no alert to notify map segment has not mapped to audit program.During VEM audit schedule "Schedule created" alert has displayed but no audit generated because of not mapping segment
#15849 Nikhil d
11:35 AM Bug #15831 (Resolved): escalation mail for before/after due-mail-If 1 nc and 1 OFI uploaded only 1 nc uploaded context displaying but details shows both
Nikhil d
11:35 AM Bug #15823 (Resolved): Both reminder and escalation(enabled)-Business rule and Suite Route has set up -Escalation setting frequency wise not working
Nikhil d
11:35 AM Bug #15822 (Resolved): Business Rule-Reminder set up-Confirmed audit-Reminder for conducting an audit-context is mismatch (for after due date it shows before due date)
Nikhil d
11:35 AM Bug #15821 (Resolved): Business Rule-Reminder set up-• Tentative-Reminder for auditor/auditee availability confirmation email
Nikhil d
11:35 AM Bug #15819 (Resolved): VAM-Escalation for NC, Close out emails still displays in batch manager even after closed out the VAM audit
Nikhil d
11:35 AM Bug #15818 (Resolved): Escalation set up • Escalation only set up -when running R2 ,emails sent to R3 users also
Nikhil d
11:32 AM Bug #15733 (Resolved): Supplier Report-If commodity have only BU and no Sub BU then all the report related to commodity not showing the details properly
Nikhil d
11:32 AM Bug #15717 (Resolved): BU report-Sub BU not showing correct for the BU
Nikhil d
11:32 AM Bug #15711 (Resolved): Supplier Report-Mapping structure report-Commodity listing lissue(filter issue)
Nikhil d
11:32 AM Bug #15706 (Resolved): Audit score report-SCAR value shows wrong
Nikhil d
11:32 AM Bug #15705 (Resolved): Label for Adherence,process audit report mismatch between menu and in report heading
Nikhil d
11:32 AM Bug #15685 (Resolved): Supplier Report-Audit score Report-Though no nc raised while performing VEM in audit report it shows 1 in Red
Nikhil d
11:32 AM Bug #15684 (Resolved): Supplier Report-Audit score report-Score shows mismatch between audit report and audit performed.Refer screen shot
Nikhil d
11:32 AM Bug #15683 (Resolved): Supplier Reports-Based on the filter report is not showing instead it is showing all the data
Nikhil d
11:32 AM Bug #15682 (Resolved): Supplier Report-Reports showing both VAm and VEM reports instead it should show only VEM reports
Nikhil d
11:32 AM Bug #15681 (Resolved): Supplier Report-Site specific filter is not available.Report shows data from all the sites related to filter
Nikhil d
11:32 AM Bug #15680 (Resolved): VEM audit calender-Tentative event audit unable to confirm using update option as on clicking audit the details not getting loaded
Nikhil d
11:32 AM Bug #15678 (Resolved): Supplier Report:Report shows only commodity audits not showing audit done for parts mapped to those commodity
Nikhil d
11:32 AM Bug #15677 (Resolved): Supplier Report:SQIE not listing auditor name specific to audit instead it shows all SQI assigned for the supplier
Nikhil d
11:30 AM Bug #15848: VEM audit-Site name( NRPO-special economy zone)site) not listing in engagement model screen viewing form corporate(india ABO) site
Not an issue Nikhil d
11:29 AM Bug #15832 (Resolved): Multi site-Email is not working for routine audit
fixed Nikhil d
11:26 AM Bug #15847 (Resolved): Cummins-VAM audit-Scheduled audit from corporate to different site has not listed to VQI
Bug #15665 : Duplicate Nikhil d
11:25 AM Bug #15849 (Resolved): VEM-Event Audit-Unable to create event audit as "Please select audit type" alert is keep on displaying.(no map segment)
not an issue as discussed Nikhil d

03/16/2020

03:02 PM Bug #15888 (Closed): Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be published"
Publish document - When tries to publish the document from Multisite, it displays error like "Document could not be p... Kiruthika G
 

Also available in: Atom