Apply Clear
1. Log in to the RFD.2. Select the Block Diagram.3. Select the Production Item.4. Add the elements to the Diagram.5. Select the Interface Function Matrix.6. Remove the elements.7. Observe the result.
1. Log in to the RFD.2. Select the Interface Matrix.3. Select the Production Item.4. Double-click and add multiple values.5. Observe the result.
1.Log into FST2.Select FSR3.Locate a safety goal and add function and Requirement4.Decompose and perform add asil5.Allocate decomposed function to child6.Add technical function and Requirement against it7.Go to VOC page8.Please select the allocated element from BOM tree9.Please observe
1.Log into FST2.Select FSR3.Locate a safety goal and add function and Requirement4.Decompose and perform add asil5.Allocate decomposed function to child6.Add technical function and Requirement against it7.Select TSC menu of allocated element and observe
1.Enter url.2.Login with the module admin/PM Username and Password.3.Select Supplier Platform4.Go to Supplier Management > Project Management > Programs5.Click on the button +New6.Select the pillar where Supplier added as element7.Click on BOM Import and select the PI where the part need to be added.
8. Save the project after Import
9. Navigate to Aqua pro and check for the PI under Purchased parts
1. Log in to the VDA.2. Select the Block Diagram.3. Select the Production Item.4. Make a child of the higher element in the Production item tree.5. Select the copied higher element from the context element dropdown.6. Observe the result.
1. Log in to the VDA.2. Select the Functional Analysis.3. Select the Production item.4. Add the two level flowdowns.5. Right-click on the second level flow down and select the Delete branch.6. Observe the result.
1. Log in to the VDA.2. Select the P Diagram.3. Select the Production Item.4. Select the Cause from the dropdown.5. Off the toggle and On it.6. Refresh the page.7. Observe the result.
1.Log into FST2.Select HARA page3.Add a record and calculate asil value along with Safety goal value4. Right click on the Failure mode column and observe
1.Log into FSR2.Select a safety goal3.Add a function and Requirement4.Decompose into two5.Go to HARA page and recalculate the ASIL6.Go back to FSR and observe
1.Log into FSR2.Select two safety goals3.Add a function against the lower asil4.Decompose into two 5.USe one of the decomposed function against tge higher asil6.Please observe
1. Log in to the VDA.2. Select the Functional Analysis.3. Select the Production Item.4. Expand the BOM Tree.5. Click and drop and add the second level flow down.6. Observe the result.
1. Log in to the VDA.2. Select the P Diagram.3. Select the Production Item.4. Select the Cause from the dropdown.5. Off the toggle and On the Toggle.6. Refresh the page.7. Observe the result.
1. Log in to the RFD.2. Select the Block Diagram.3. Select the Production item.4. Draw an interface line between two elements.5. Change the target.6. Select the Interface line from the Filter.7. Observe the result.
1. Log in to the VDA.2. Select the Functional Analysis.3. Select the Production Item.4. Add an element from the Add Existing Element.5. Search for the same element in the Add Existing element popup.6. Select the checkbox.7. Observe the result.
Step 1: Login as Super user.Step 2: Audits->Audit setup-> Checklist.Step 3: Click import Checklist button.Step 4: Click Add excel. System will navigate the local location.Step 5: Select the file from the local device.Step 6: Click Upload button. (Upload button color will be change after uploaded)
Step 1: Login as Auditor.Step 2: Audits-> Auditor-> Auditor Competency Evaluation.Step 3: Click the Auditor role dropdown. Select any of Roles
1. Enter the site URL 2. Enter the user credentials 3. Select platform as Integrated Management System /QHSE Platform4. On the home page go to Setup -> Audits Setup -> Department Area5. Click on the either Manufacturing line, Assemble Line, Equipment, or Non-Manufacturing Line in the Department Area Tree6. Navigate to the Checklist(s) tab
1.Copy the below Folder Structure (Click Copy icon on Level A)Level A (Not In Use)-- Level A1 (Not In Use)---- Level A.1 (In Use)
2.Paste it under another Level B3.Only the LevelA is getting PastedIssue: While Pasting, the Level Hierarchy breaks when there is a Not In Use Level
1.Navigate to Folder Management2.Right click on LevelA3.Select Rights for Site4.Check Inherit in Document Creation and Document Access5.Now, Right click on LevelA and click Copy icon6.Right on another LevelB (which is Not in Use)7.Click Paste8.Now, Right click on Pasted Level and click Rights for Sites9.Rights are EMPTY
1. Enter the site URL 2. Enter the user credentials 3. Select platform as Integrated Management System /QHSE Platform 4. Audits -> LPA Schedule5. Click on the Scheduled Audit
1.Navigate to Business Rules2.Click on Hide Recent Doc Updates Folder List icon3.Search "Doc" 4.It's bringing the Levels where all are not in UseFacing the same issue in Document Management as well.
1. Enter the site URL 2. Enter the user credentials 3. Select platform as Integrated Management System /QHSE Platform4. Audits -> Corrective Actions
1.Login BOSS 2.Goto Business planning strategy->Expectation matrix3.Click and open4.OBR: The delete icon is there where the expectation is not added5.ER:Delete icon is needed only when the user adds the expectations
1.Enter the site URL 2.Enter the user credentials 3.Click on Setup tab from menu. 4. Click on Process/Activities icon.5. Click on "New" button6. Click on Process Scope dropdown and select any process scope
Also available in: Atom CSV PDF
Selected Columns All Columns
Encoding ISO-8859-1 UTF-8
Cancel