General

Profile

Siva ram Gudipudi

  • Login: sivaram
  • Registered on: 03/31/2022
  • Last connection: 04/16/2025

Issues

open closed Total
Assigned issues 1 1 2
Reported issues 21 179 200

Projects

Project Roles Registered on
All Customer Issues QA Engineer 11/14/2022
Customization QA Engineer 02/28/2024
Known Issue QA Engineer 02/25/2024
SP 10.6.1.12 Hotfix QA Engineer 03/31/2022
SP 10.6.1.15 QA Engineer 06/06/2022
SP 10.6.1.17 HF QA Engineer 07/19/2022
SP 10.6.1.27 HF QA Engineer 08/19/2013
SP 10.6.1.28 HF QA Engineer 09/12/2013
SP 10.6.1.29 HF QA Engineer 10/10/2013
SP 10.6.1.30 HF QA Engineer 10/20/2013
SP 10.6.1.31 HF QA Engineer 11/23/2013
SP 10.6.1.32 QA Engineer 07/04/2023
SP 10.6.1.34 Patches QA Engineer 10/31/2023
SP 10.6.1.36 HF QA Engineer 03/06/2024
SP 10.6.1.37 HF QA Engineer 08/28/2024
SP 10618 HF QA Engineer 08/29/2022
SP 11.0 QA Engineer, Project Lead 07/26/2013
SP 11.0.0.1 Hotfix QA Engineer 03/31/2022
SP 11.0.0.2 QA Engineer 06/06/2022
SP 11.2.0 QA Engineer 07/04/2022
SP 11.2.0.1 QA Engineer 11/03/2022
SP 11.2.0.10 Patches QA Engineer 11/17/2023
SP 11.2.0.11 Patches QA Engineer 12/15/2023
SP 11.2.0.12 Patches QA Engineer 01/01/2024
SP 11.2.0.13 Patches QA Engineer 01/06/2024
SP 11.2.0.14 Patches QA Engineer 02/12/2024
SP 11.2.0.15 Patches QA Engineer 04/27/2024
SP 11.2.0.16 Patches QA Engineer 06/13/2024
SP 11.2.0.17 Patches QA Engineer 08/28/2024
SP 11.2.0.18 Patches QA Engineer 11/27/2024
SP 11.2.0.19 Patches QA Engineer 03/04/2025
SP 11.2.0.2 HF QA Engineer 07/18/2013
SP 11.2.0.4 HF QA Engineer 12/07/2013
SP 11.2.0.9 Patches QA Engineer 10/31/2023
SP 11.3.0 QA Engineer 02/12/2024
SP 11.3.2 QA Engineer 10/23/2024
SP 11.3.2.2 Patches QA Engineer 03/11/2025
SP 11203 HF QA Engineer 08/26/2013
SPRINT QA Engineer 03/03/2024
Supavut QA Engineer 11/13/2024

Activity

04/16/2025

10:56 AM SP 11.3.2.2 Patches Bug #30553 (Open): Reports:-When the user sets the date preference to [MMM/DD/YYYY] or [DD/MMM/YYYY], the date fields appear empty on both the External-Lab and Calibration Verification Report pages.
1.When the user sets the date preference to [MMM/DD/YYYY] or [DD/MMM/YYYY], the date fields appear empty on both the ... Siva ram Gudipudi

04/10/2025

04:01 PM SP 11.3.2.2 Patches Bug #30541: External-lab:- "When clicking the download button, a pop-up displays an alert message: 'Reporting Service Error'."
https://testlink.ewqims.net/ltx.php?item=exec&feature_id=66745&build_id=67 Siva ram Gudipudi
04:01 PM SP 11.3.2.2 Patches Bug #30541 (Open): External-lab:- "When clicking the download button, a pop-up displays an alert message: 'Reporting Service Error'."
1."When clicking the download button, a pop-up displays an alert message: 'Reporting Service Error'." Siva ram Gudipudi
03:56 PM SP 11.3.2.2 Patches Bug #30540: SSR Reports :- Unable to publish reports
https://testlink.ewqims.net/ltx.php?item=exec&feature_id=66752&build_id=67 Siva ram Gudipudi
03:56 PM SP 11.3.2.2 Patches Bug #30540 (Open): SSR Reports :- Unable to publish reports
1.Unable to publish reports Siva ram Gudipudi

03/03/2025

11:03 AM SP 11.3.2 Bug #30079 (Closed): Doc pro :- The documents are not displaying the TOC page, but it is visible in the Document Management system.
!clipboard-202503031100-rrz7o.png!
it is working cycle 5 build
Siva ram Gudipudi

02/20/2025

02:38 PM SP 11.2.0.18 Patches Bug #29873 (Closed): Part wise schedule :- "Initially, frequency and due dates were selected in the Gage screen for all studies. However, after unchecking those studies in the Gage screen, the frequencies and due dates are still being displayed in the Part-Wise Schedule scree
Siva ram Gudipudi
02:37 PM SP 11.2.0.18 Patches Bug #29862 (Closed): Gage screen:- "Even after selecting Type 1 Study, an alert is displayed stating, 'Please select at least one study.'"
Siva ram Gudipudi
02:37 PM SP 11.2.0.18 Patches Bug #29859 (Closed): Type 1 Study :- "When the 'Type 1 Close-Out Study Rights' option is unchecked on the Groups page, an unknown error occurs when clicking the Calculate button while performing a Type 1 study."
Siva ram Gudipudi
12:30 PM SP 11.2.0.18 Patches Bug #29960 (Closed): Gage visual management report:- "The hyperlink for the planned date is not displaying in the GRR study."
Siva ram Gudipudi

Also available in: Atom