Steps To Reproduce:
1. Login as EwQIMS as Operator
2. Click on Equipment menu
3. Create a Equipment with UBM activity
4. Click on Equipment part linkage
5. Create a Part name as 123_Part 1 and copy and paste in description
(Create 5 part like this)
6. Click on Production OEE
7. Select the mandatory field
8. Select the first two parts
9. Enter the shift details for first parts
10. Observe the losses entry grid
11. Edit the second part and observe the losses entry grid
(Refer screenshot)
MODULES:
TPM
Build Cycle:
Cycle 5
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
Description
Production OEE: When creating the 5 different part with description and selecting two for parts production in production OEE screen, it shows the Losses entry for different part which is not selected by operator.
Kindly refer screenshot.
Files
Actions