Project

General

Profile

Actions

Bug #15597

closed

Production OEE: When creating the 5 different part with description and selecting two for parts production in production OEE screen, it shows the Losses entry for different part which is not selected by operator

Added by Kiruthika G over 5 years ago. Updated over 5 years ago.

Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
01/24/2020
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login as EwQIMS as Operator
2. Click on Equipment menu
3. Create a Equipment with UBM activity
4. Click on Equipment part linkage
5. Create a Part name as 123_Part 1 and copy and paste in description
(Create 5 part like this)
6. Click on Production OEE
7. Select the mandatory field
8. Select the first two parts
9. Enter the shift details for first parts
10. Observe the losses entry grid
11. Edit the second part and observe the losses entry grid
(Refer screenshot)

MODULES:
TPM
Build Cycle:
Cycle 5
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

Production OEE: When creating the 5 different part with description and selecting two for parts production in production OEE screen, it shows the Losses entry for different part which is not selected by operator.

Kindly refer screenshot.


Files

Actions #1

Updated by Kiruthika G over 5 years ago

  • Subject changed from Production OEE: When creating the 5 different part with description and selecting two for parts production in production OEE screen, it shows the Losses entry for different part which is not selected to Production OEE: When creating the 5 different part with description and selecting two for parts production in production OEE screen, it shows the Losses entry for different part which is not selected by operator
Actions #2

Updated by User Admin over 5 years ago

  • Status changed from New to Open
Actions #3

Updated by Anonymous over 5 years ago

  • Status changed from Open to Resolved
Actions #4

Updated by Kiruthika G over 5 years ago

  • Status changed from Resolved to Closed
Actions

Also available in: Atom PDF