Apply Clear
1.Go to interested party and click Vision, mission, values and quality policy. See the page2.Observe the result
1.Login as reviewer2. Check for Actions page3. Select requirement and check for the butttons
1) Login as admin2) Click on Users-> Entity icon and observe3) Click on Entity in Setup and Observe
Add production item screen->While selecting commodity "Do you want include all parts?" alert still showing old UI.Ok,Cancel buttons also not in new UI change
Audit program setup->Map entity->No save alert upon changing auditee and on saving
1)Login as apqp admin2)click on burndown report3)Select the project name as burn down4)Observe the data
1)Login as Project Manager2)Click on Tracking matrix report3)Select the project and click on view report
1)Login as Project Manager2)Click on Project summary report3)Select the project and view data
1)Login as Project Manager2)Click on Project summary report3)Select the completed project and observe the actual finish date column missing
Audit Pro Actions -> Exported Data -> Chinese and Thai characters are not getting displayed on exported document
1.Login as admin2.Go to actions 3.Click on export pdf button 4.After downloading, open the document
PFB the description /attachment
1)Login as APQP admin2)Click on issues setup menu under setup tab3)Observe the tab
Actions-> Remove the word new in exported data, Ref ss
1) Login as admin2) Click on supplier3) Select any supplier 4) mouse over and remove mouse and Observe
1. Login EwQIMS as TPM Module administrator2. Click on PM Supervisor and PM Calendar(Die and Equipment) 3. Click on Assigned or scheduled WO4. Click on Definition code5. Observe the behavior
1.Click on advanced search
2.click on search
3.Now search any of the fields say document name with search criteria as "DocA"
4.Now click on Edit search
5.Either Select level or Enter any search criteria say document name with "Doc B"
6.CLick on search
7.Doc B is not listed since the screen is not refreshed with the previous selected criteria "DocA"
1.Login to Ewqims2.GO to DOc pro3.Click on Advanced search4.Click on search5.All the documents from all the levels are displayed6.Click on the document present in QMS level7.Click on back link8.It shows the QMS level documents alone
Advanced search:Search scope: Better to enable include sub level only if level is selected(no meaning that if we select it without selecting the level)
1. Login EwQIMS as TPM Module administrator2. Click on Production OEE menu3. Need accordion performance in Availability, Performance and Rate of Quality
1.Login as AQuA Pro Module Administrator
2.Click on AQuAPro -> Main2
3.Expand Global -> Select a PI
4.Click on AIAG-VDA PFMEA/DFMEA under the Process/Design Documents
5.View the PI Scroll Bars
6.Observe the Result
1. Login EwQIMS as TPM Module administrator2. Click on Common date picker in Equipment, Die, PM Supervisor, PM Calendar, Production OEE, CBM3. Observe the Calendar
1.Login as FST Module admin in both browsers2. Select PI and select VOC3. Click on the skip review/4, Check the behavior
1.Go to Boss setup and open boss template properties.2.Click add
All Pages-
Also available in: Atom CSV PDF
Selected Columns All Columns
Encoding ISO-8859-1 UTF-8
Cancel