Bug #16022
closedTime Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
0%
1. Login EwQIMS as MSA module administrator
2. Click on External lab calibration and conduct the study
3. Study date as 1-4-2020
4. Frequency as 1 month
5. Next due date is 1-5-2020
6. Click on Action menu
7. Observe the Due date
Description
Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR: Due date is showing wrongly. Kindly refer the screenshot
Action:
Issue 1: External lab calibration: Due date is showing wrongly. Kindly refer the screenshot
When completed the study in 1-4-2020 (1 month) and the next due date is 1-5-2020, but in action's due date is showing as 2-5-2020
Issue 2: Bias: Action --> The action created date and due date is showing wrongly
Issue 3: Calibration (Variable and Attribute) - Due date is showing wrongly(it shows next date for ex 1-04-2020 study done, here it shows 2-04-2020)
Issue 4: Calibration verification- Due date is showing wrongly in action menu(study done at 2-04-2020 but in action created date is showing as 03-04-2020) and the due date is showing (next due in study 2-05-2020 but in action 03-05-2020)