Activity
From 05/03/2021 to 06/01/2021
06/01/2021
- 06:39 PM Bug #16044 (Closed): GRR-Multi parameter- Actions->(Central - IST)--> When tries to conduct the study for multi parameter, the due date for both parameter shows wrongly. Kindly refer screenshot
- Consolidated as one issue. #16766
- 06:39 PM Bug #16030 (Closed): Action: Time Zone(Central - IST) Master- Inhouse- Calibration study--> Action created date is not showing in the action menu and the due date is showing wronly
- Consolidated as one issue. #16766
- 06:38 PM Bug #16022 (Closed): Time Zone: Action: External Lab calibration, Bias and Calibration(V and A), Calibration verification, GRR(A and V): Due date is showing wrongly. Kindly refer the screenshot
- Consolidated as one issue. #16766
- 06:37 PM Bug #16021 (Closed): Time Zone(Server date is 30-3-2020 and the Client date is 31-03-2020). When a user tries to attach or publish the document, it shows server date in Doc pro published level
- Consolidated as one issue. #16766
- 06:37 PM Bug #15956 (Closed): Time Zone: Eastern or Central - When the day light saving is on for the client machine, it shows the logged in user date and time of the day light off time details
- Consolidated as one issue. #16766
- 06:37 PM Bug #15919 (Closed): Time Zone(Central - Central & Central - Eastern Time) Gages, Master and all the study --> It shows wrong date
- Consolidated as one issue. #16766
- 06:36 PM Bug #15890 (Closed): Time Zone(Subtract date - Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description
- Consolidated as one issue. #16766
05/17/2021
- 03:40 PM Bug #16039 (Closed): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
- 03:40 PM Bug #16025 (Closed): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
- 03:40 PM Bug #15969 (Closed): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
- 03:40 PM Bug #15926 (Closed): Actions: Need to display the Linearity study details in action
- 03:40 PM Bug #15908 (Closed): Import-->Common-->Linearity is not handled in Gages import functionality
- 03:40 PM Bug #15901 (Closed): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
- 03:40 PM Bug #15841 (Closed): Gages: When tries to copy gage, the Work instruction of Gage type is getting deleted, but the Work instruction attachment is not getting deleted from the gage screen
- 03:40 PM Bug #16071 (Closed): Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is not getting updated in Certificate
- 03:34 PM Bug #16099 (Closed): MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate details in Action menu calibration verification field
- 03:34 PM Bug #16102 (Closed): Calibration verification(Master- Variable and Attribute - inhouse) - The study is not showing in the action menu
05/13/2021
- 02:44 PM Bug #16078 (Closed): Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same.
- 02:43 PM Bug #16031 (Closed): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
05/10/2021