Actions
Bug #14652
closedUtility Equipment: Utility Equipment: while creating the utility equipment, entered equipment details of Vendor, manufacturer, criticality, commission date and production date is not getting saved
Status:
Closed
Priority:
High
Assignee:
-
Start date:
10/29/2019
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1. Login EwQIMS as TPM Module Administrator
2. Click on Equipment menu
3. Right click on Non manufacturing line
4. Create Utility Equipment
5. Enter all the mandatory field
6. Click on save button
7. Observe the Equipment detail field
MODULES:
TPM
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
SP920
IMPCAT Area If any ::
Impcat Verifed:
Yes
Description
Utility Equipment: while creating the utility equipment, entered equipment details of Vendor, manufacturer, criticality, commission date and production date is not getting saved
(after saved the Equipment it showing current date in commission and production date field)
Files
Actions