Actions
Bug #1020
closedCalibration verification and Bias Study-External to Inhouse conversion
Start date:
05/05/2017
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1)Login into EwQIms Application
2)Select MSA Module
3)Go To Gages Menu
4)Select the TYPE
5)Select the gage with External Lab
6)Perform study for Calibration verification
7)Go To Gages menu screen
8)Select the TYPE and gage
9)Change the Calibration Lab
10)Click on SAVE
11)Observe the Results
MODULES:
MSAPRO
Build Cycle:
Cycle 0
Customer:
Issue Dependency:
636
Dev Commitment to Resolve in::
NA
Description
1)when external lab gage is moved to inhouse after performing one study the calibration verfification and Bias study column is not showing the external lab initial schedule date.
2)Not able to edit the date column also
Note: Same problem When changing to In-house to External Lab also
Bias , Calibration Verification , Gage RR study , Stability study