Bug #1020
Updated by Anonymous almost 8 years ago
1)when external lab gage is moved to inhouse after performing one study the calibration verfification and Bias study column is not showing the external lab initial schedule date.
2)Not able to edit the date column also
Note: Same problem When changing to In-house to External Lab also
Bias , Calibration Verification , Gage RR study , Stability study