Project

General

Profile

Activity

From 04/18/2021 to 05/17/2021

05/17/2021

03:40 PM Bug #16039 (Closed): (Calibration verification - External and Inhouse)Action: The study details is showing duplicate in action screen
User Admin
03:40 PM Bug #16025 (Closed): Bias: When tries to complete the bias study for one parameter and clicking on cancel button, the status of the study shown as "Pending close out" instead of Pending incomplete
User Admin
03:40 PM Bug #15969 (Closed): Calibration verification --> if the last study date is current date, it allows user to select and save the past date
User Admin
03:40 PM Bug #15926 (Closed): Actions: Need to display the Linearity study details in action
User Admin
03:40 PM Bug #15908 (Closed): Import-->Common-->Linearity is not handled in Gages import functionality
User Admin
03:40 PM Bug #15901 (Closed): Time Zone(Subtract date - Disabled) - Server date is Eastern time and the Client IST related issue. Kindly refer description
User Admin
03:40 PM Bug #15841 (Closed): Gages: When tries to copy gage, the Work instruction of Gage type is getting deleted, but the Work instruction attachment is not getting deleted from the gage screen
User Admin
03:40 PM Bug #16071 (Closed): Master- Inhouse-- Calibration study -Certificate--> Multi parameter - The second parameter study date and due date is not getting updated in Certificate
User Admin
03:34 PM Bug #16099 (Closed): MSA Calendar--> Calibration verification- When tries to close the pending close out study, it showing duplicate details in Action menu calibration verification field
User Admin
03:34 PM Bug #16102 (Closed): Calibration verification(Master- Variable and Attribute - inhouse) - The study is not showing in the action menu
User Admin

05/13/2021

02:44 PM Bug #16078 (Closed): Gage-->If user tries to copy gage from the Completed study gage, it shows both Last due date and next due date as same.
User Admin
02:43 PM Bug #16031 (Closed): Calibration: When ties to save the study using Multi parameter, the minimum date is not showing in the grid. Once completed the study, it showing the minimum date
User Admin

05/10/2021

02:13 PM Bug #15914 (Closed): Multi Language: MSA multi language issue list. Please refer Excel sheet
Kiruthika G
 

Also available in: Atom