Apply Clear
1.Select a Production item that has system, subsystem, component and Sub-component2.Click on Design VDA tab3.Select Interface Function Matrix Menu4.Allocate priorities for all the elements5.Select Function/Failure analysis menu6.Observe the flowdown
1.Select a Production item 2.Click on Process VDA tab3.Select Functional/Failure analysis tabs4.Right click on created operations and enter the data5.Select multiple data 6.observe the result7.In Structure Analysis under 4M icon click on 4M Icon and create Man,Material,Method and Machine, select Man,Material,Method & Machine and click on done button, only Man is displayed whereas Man,Material,Method & Machine should display
1.Select a Production item 2.Click on Design VDA tab3.Add Cause for the selected PI 4.Select Failure Analysis tab 5.Right click on the Cause table and select Optimization6.Select Revision date and Preventive Completion Date7.Observe the Result
1.Select a Production item 2.Click on Design VDA tab3.Select functional/Failure analysis4.Add function, requirement in tree5.Observe the result
Also available in: Atom CSV PDF
Selected Columns All Columns
Encoding ISO-8859-1 UTF-8
Cancel