Actions
Bug #9832
closedHARA – In HARA Document, after clicking Operational Situation button and clicking Refresh button is changing the background HARA document as Operational Situation Document. (Refer Description)
Status:
Closed
Priority:
High
Assignee:
-
Start date:
11/22/2018
Due date:
% Done:
100%
Estimated time:
Steps To Reproduce:
:
1.Login as FST Module administrator
2.Select a PI
3.Select HARA fom HARA menu
4.Select Operational Situation button
5.Click on Refresh and Observe the result
6.Close the dialog window and Right Click on the existing window
7.Observe the result
MODULES:
FST
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
IMPCAT Area If any ::
Impcat Verifed:
Description
HARA – In HARA Document, after clicking Operational Situation button and clicking Refresh button is changing the background HARA document as Operational Situation Document.
• While this action is done on Right Click system Displays Option for HARA page.
Files
Actions