Bug #30603
openSchneider->Change Request → Current Revision value is C.0 → If we click the major, D.0 is shown in the next revision; then if we click the minor, the same current revision value, C.0, is shown as the next revision. It needs to show C.1.
0%
1.Login as user and Folder management settings as A.0 custom
2.Go to TOC
3.Select the change request
4. Current Revision value is C.0 → If we click the major, D.0 is shown in the next revision; then if we click the minor, the same current revision value, C.0, is shown as the next revision. It needs to show C.1. This occurs for both C and D
Description
1.Change Request → Current Revision value is C.0 → If we click the major, D.0 is shown in the next revision; then if we click the minor, the same current revision value, C.0, is shown as the next revision. It needs to show C.1. This occurs for both C and D (for both lowercase and uppercase alphabets).
2.Change request -->Current Revision value is II.0--> If we click the major, III.0 is shown in the next revision, then if we click the minor, the same current revision value, II.0 sis shown as the next revision. it needs to show II.1 [It occurs for II, III, IV] - (for small and capital Roman)
Files