Project

General

Profile

Actions

Bug #30384

open

Failure Analysis - After adding the failure flowdown, it is linked to the above branch, and the requirement flowdown for the other branch is only displayed after collapsing and expanding.(Refer Description)

Added by Gopinath Ramamoorthy about 1 month ago. Updated about 10 hours ago.

Status:
Not Resolved
Priority:
Medium
Assignee:
Start date:
03/17/2025
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Log in to the VDA.
2. Select the Functional Analysis.
3. Select the Production Item.
4. Add two Requirements for the Function.
5. Add the same Requirement Flow down.
6. Add the Failure for one focus requirement.
7. Right-click on another flow-down branch and add the Failure.
8. Observe the Result.

MODULES:
VDA
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

Failure Analysis -
1. Two requirements were added for the function.
2. The same requirement flow down is added.
3. A failure was added for one focus branch, but the failure flowdown is displayed for another branch.
4. After adding the failure flowdown, it is linked to the above branch, and the requirement flowdown for the other branch is only displayed after collapsing and expanding.


Files

23.png (139 KB) 23.png Gopinath Ramamoorthy, 03/17/2025 06:07 PM
24.png (96.2 KB) 24.png Gopinath Ramamoorthy, 03/17/2025 06:07 PM
Actions #1

Updated by Reng Raj about 1 month ago

  • Status changed from New to Open
  • Assignee changed from chitra Kalangiam to Reng Raj
Actions #2

Updated by Reng Raj about 1 month ago

  • Status changed from Open to Fixed in Dev
Actions #3

Updated by Reng Raj 28 days ago

  • Status changed from Fixed in Dev to Resolved
Actions #4

Updated by Gopinath Ramamoorthy about 10 hours ago

  • Status changed from Resolved to Not Resolved
Actions

Also available in: Atom PDF