Actions
Bug #30333
openFunctional Analysis - When adding the second-level flowdown, the system throws an 'Expand the BOM' alert, even though the tree is already expanded to the child level.
Start date:
03/11/2025
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1. Log in to the VDA.
2. Select the Functional Analysis.
3. Select the Production Item.
4. Expand the BOM Tree.
5. Click and drop and add the second level flow down.
6. Observe the result.
MODULES:
VDA
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
Description
When adding the second-level flowdown, the system throws an 'Expand the BOM' alert, even though the tree is already expanded to the child level.
Files
Actions