Actions
Feature/Enhancement #30187
openProduction Item - Able to drag and drop the Production Item and add the Child PI, but after a refresh, it is removed.
Start date:
02/13/2025
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1. Log in to the RFD.
2. Select the Requirements Document.
3. Expand the Global production item.
4. Click and drag the PI.
5. Observe the result.
MODULES:
RFD
Build Cycle:
Cycle 4
Customer:
Issue Dependency:
Moved from SP11.3.2 to SP 11.3.2.2
Dev Commitment to Resolve in::
Description
Able to drag and drop the Production Item and add the Child PI, but after a refresh, it is removed.
Files
Updated by User Admin 2 months ago
- Tracker changed from Bug to Feature/Enhancement
Control team dependency , so moving to the next release as we are in the last cycle of testing.
Updated by Shankar Narayanan 11 days ago
- Project changed from SP 11.3.2 to SP 11.3.2.2 Patches
- Issue Dependency set to Moved from SP11.3.2 to SP 11.3.2.2
Actions