Project

General

Profile

Actions

Bug #28309

closed

Add risk and optimization after the name, the system displays different names like (OR=1 and DR=1).

Added by Kirubakaran chandran 10 months ago. Updated 10 months ago.

Status:
Closed
Priority:
High
Assignee:
Start date:
06/19/2024
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login as AQuA Pro Module Administrator
2. Click on the Products Tab and select Design VDA Menu.
3. Select the Failure Analysis menu
4. Select a Production Item
5. Right-click on the Design Cause or Flowdown element
6. Select RiskĀ 
7. Add Preventiv/Detective and click on ok button
8. Observe the result

MODULES:
VDA
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

When I add risk and optimization after the name, the system displays different names like (OR=1 and DR=1).

Note: The issue Occurred in Design and Process VDA Risl and Optmization page

Refer TC: http://14.194.186.13:8080/testlink/linkto.php?tprojectPrefix=EwQIMS&item=testcase&id=EwQIMS-10885


Files

1.png (86.8 KB) 1.png Kirubakaran chandran, 06/19/2024 05:36 PM
Actions

Also available in: Atom PDF