Project

General

Profile

Actions

Bug #27181

closed

Requirements Document Traceability issues (Refer Description)

Added by Gopinath Ramamoorthy about 1 year ago. Updated about 1 year ago.

Status:
Closed
Priority:
Medium
Assignee:
Start date:
02/05/2024
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Log in to the FST.
2. Click on the Requirements Document.
3. Add the FLow up.
4. Add multiple Flow down and click on the Traceability icon.
5. Click on the sort icon on the Traceability popup.

MODULES:
FST
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

1. Added multiple flow-downs, and the VOC ID is not showing for some elements.
2. VOC Traceability needs to be changed to Requirements Document.
3. Clicked on the Sort icon, the diagram is not in descending order.
4. Added the Flow-Up, but the traceability icon is not showing after the refresh.
5. The Traceability icon is duplicated after adding the Flow-Up multiple times.
6. If a single function has multiple requirements, the tree in the traceability VOC ID and Function are duplicated.


Files

46.png (44.6 KB) 46.png Gopinath Ramamoorthy, 02/04/2024 02:06 AM
47.png (39 KB) 47.png Gopinath Ramamoorthy, 02/04/2024 02:06 AM
51.png (40.6 KB) 51.png Gopinath Ramamoorthy, 02/06/2024 11:45 PM
52.png (160 KB) 52.png Gopinath Ramamoorthy, 02/06/2024 11:45 PM
Actions

Also available in: Atom PDF