Bug #26679
closedDesign VDA Flow up and Flow down issues (Refer Description)
0%
1. Login as AQuA Pro Module Administrator
2. Click on the EWQIMS icon and select EVAV NPD/APQP Platform
3. Click on the Products(Aqua Pro) menu
4. Click on the Design VDA menu
5. Click on the Functional Analysis menu
6. Select the Production Item
7. Right Click on the Element and select Flow down/Flow Up
Description
1. Requirement flow down check box not working properly, click on ok button not working
2. Function flow up check box not working properly, click on ok button not working
3. While performing the same function multiple times, the system allows for multiple flow up operations.
4. While performing flow down, without expanding nodes, the system displayed an incorrect alert message.
Refer TC: http://saas.omnex.in:81/testlink/linkto.php?tprojectPrefix=EwQIMS&item=testcase&id=EwQIMS-10901
Files