Project

General

Profile

Actions

Bug #25829

closed

In Process VDA Structure Analysis connecting arrows not pointing in the right direction

Added by Kirubakaran chandran almost 12 years ago. Updated over 1 year ago.

Status:
Closed
Priority:
Medium
Assignee:
Start date:
02/21/2023
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login as AQuA Pro Module Administrator
2. Click on the EWQIMS icon and select EVAV NPD/APQP Platform
3. Click on the Products(Aqua Pro) menu
4. Click on Process VDA and select Structure Analysis
5. Select Production Item and the process segment pop-up window appears.
6. Select a segment and click on the Done button
7. Click on Add Operation Icon
8. Enter Data (Number & Name) and Click on Done Button
(Create Two different operation)
9. Righ Click on Operation
10. Select Create FourM Category]
11. Enter Data (FourM Category and FourM)
12. Click on Create Button
13. Click on Create 4M icon in another operation
14. Select Previosuly selected 4M
15. Click on Done button
16. Click on Refresh Icon
17. Observe the result

MODULES:
VDA
Build Cycle:
Cycle 1
Customer:
Issue Dependency:

Description

When Creating the FourM category in Process VDA Structural Analysis, adding the 4M, and then adding the same FourM directly in operation, then clicking on the Refresh icon, The connecting arrow has collapsed and is not pointing in the right direction

Refer TC: http://saas.omnex.in:81/testlink/linkto.php?tprojectPrefix=EwQIMS&item=testcase&id=EwQIMS-24307


Files

structure analysis-1.png (43.2 KB) structure analysis-1.png Kirubakaran chandran, 09/13/2013 07:25 PM
structure analysis-2.png (50.4 KB) structure analysis-2.png Kirubakaran chandran, 09/13/2013 07:25 PM
Actions

Also available in: Atom PDF