Bug #21322
closedR2 Requirement --> Gage No CEE-474) -->(Both variable and Attribute) The GRR date is showing wrongly, here it is showing as 4/26/2019. In study it showing like "4/18/2019".
Start date:
01/05/2021
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1. Login http://173.200.238.179/EwQIMS_Training/common/msa%20pro/API
2. Select the Requirement as R2
3. Enter the site details and Gage Number as CEE-474
4. Observe the Result and study
MODULES:
MSAPRO
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
SP925
IMPCAT Area If any ::
Impcat Verifed:
Yes
Description
Issue 1: R2 Requirement --> Gage No CEE-474) --> The GRR date is showing wrongly, here it is showing as 4/26/2019. In study it showing like "4/18/2019".
Issue 2: All Requirement --> In Response message, it shows "status":"success","message":"","data"
Issue 3: R2 Requirement --> instead of showing Factor, need to display "Assurance Factor"
Files
Updated by Kiruthika G over 4 years ago
- Subject changed from R2 Requirement --> Gage No CEE-474) --> The GRR date is showing wrongly, here it is showing as 4/26/2019. In study it showing like "4/18/2019". to R2 Requirement --> Gage No CEE-474) -->(Both variable and Attribute) The GRR date is showing wrongly, here it is showing as 4/26/2019. In study it showing like "4/18/2019".
Updated by Prabhu P over 4 years ago
- Status changed from Fixed in Dev to Fixed with Hotfix
Updated by Kiruthika G over 4 years ago
- Status changed from Fixed with Hotfix to Resolved