Actions
Bug #17563
closedProduction OEE--> New--> While selecting the Equipment / Assembly Line from Equipment pop up window, it shows error message like " Response denied"
Status:
Closed
Priority:
High
Assignee:
-
Start date:
08/03/2020
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1. Login EwQIMS as TPM module administrator
2. Click on Production OEE menu
3. Click on New button
4. Click on Equipment icon
5. Observe the error
MODULES:
TPM
Build Cycle:
Cycle 0
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
Description
Issue 1; Production OEE--> New--> While selecting the Equipment / Assembly Line from Equipment pop up window, it shows error message like " Response denied"
Issue 2: Assembly line and Equipment pop up window close button is hided in top of the screen
Issue 3: Done button is not that much visible
Files
Actions