Project

General

Profile

Actions

Bug #16701

closed

When the Existing route is set then after approving the document also it is still showing the status as awaiting approval

Added by malini C almost 5 years ago. Updated almost 5 years ago.

Status:
Closed
Priority:
High
Assignee:
Start date:
05/08/2020
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login to Ewqims
2. Select a project and link production item
3. Publish each documents
4. Check for the output attachments

MODULES:
APQPPPAP MGR
Build Cycle:
Cycle 3
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

We are facing issues with auto approval for some documents"
For the given Documents of PI-Charging System-the output is not attached after publishing the document.
  • Requirement Allocation Document
  • Item Boundaries
  • Requirement Allocation Document
    This issue is varying with different PI's for ex: Safety Goal OP Document is not attached for "Front impact airbag system",but attached for "Charging System"
    Same document(Item Boundaries) Is showing different behaviour
    1. OP attached for One deliverable and not attached for other in same PI (Refer Screenshot)

Files

FST OP Attachment.png (118 KB) FST OP Attachment.png malini C, 05/08/2020 06:27 PM
Actions

Also available in: Atom PDF