Project

General

Profile

Actions

Bug #16586

closed

Calibration->Linearity & Gage RR-->Multi parameter->For first parameter study the date received field showing Current date But for second parameter study the date received field should be empty.

Added by Kiruthika G almost 5 years ago. Updated almost 5 years ago.

Status:
Closed
Priority:
Low
Assignee:
Start date:
04/30/2020
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login EwQIMS as MSA module administrator
2. Click on Linearity and GRR menu
3. Conduct the study with multi parameter
4. Conduct study for one parameter
5. Change the parameter
6. Observe the Received date

MODULES:
MSAPRO
Build Cycle:
Cycle 2
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

Calibration->Linearity & Gage RR-->Multi parameter->For first parameter study the date received field showing Current date But for second parameter study the date received field should be empty.


Files

Actions #1

Updated by User Admin almost 5 years ago

  • Status changed from New to Open
Actions #2

Updated by Prabhu P almost 5 years ago

  • Status changed from Open to Resolved
Actions #3

Updated by Kiruthika G almost 5 years ago

  • Status changed from Resolved to Closed

Issue Verified in SP 10.0.0 CY-3(Prebuild)

Actions

Also available in: Atom PDF