Project

General

Profile

Actions

Bug #15959

closed

Master: When selecting the same last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field

Added by Kiruthika G about 5 years ago. Updated about 5 years ago.

Status:
Closed
Priority:
Medium
Assignee:
Start date:
03/25/2020
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login as MSA module administrator
2. Click on Master menu
3. Click on New
4. Enter the mandatory field
5. Set last study date as 1-3-2020 and frequency as 1 Month for calibration, linearity and calibration verification
6. Click on save button
7. Observe the Last study date of Linearity and calibration verification
8. Set the Frequency as 5-1 and click on save button
9. Observe the Frequency

MODULES:
MSAPRO
Build Cycle:
Cycle 10
Customer:
TSC & HUSCO
Issue Dependency:
SP925.3
Dev Commitment to Resolve in::

Description

Issue 1: Master: When selecting the last study date for Linearity and Calibration verification, while clicking on save button the next due date is getting updated in the Last study date field - Closed

Issue 2: Gages and Master: NO need to accept the value as 5-1 in frequency field.Once the frequency is given as 5-1, the information is saved, when tries to view the field, it displays as blank in frequency field. - Open

Kindly refer screenshot


Files

Actions

Also available in: Atom PDF