Project

General

Profile

Actions

Bug #15853

closed

Time Zone(Subtract date - Enabled & Disabled) - Server date is Central time and the Client IST related issue. Kindly refer description

Added by Kiruthika G about 5 years ago. Updated about 5 years ago.

Status:
Closed
Priority:
High
Assignee:
Start date:
03/12/2020
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1. Login as MSA Module Administrator
2. Set the subtract date as Disabaled
3. Set the frequency as "8" days and the Due is 3-13-2020 in Gage screen
4. conducting the external lab calibration study, the date on calibration is "3-12-2020"(current date) as per the frequency the next date is calculated as ""3-18-2020".
5. Cross verify the date in Gage screen
6. Last study date is "3-9-2020" and the Next due date is "3-15-2020"
7. Created Gage frequency as "7" days and the due is 11-3-2020
8. conducting the external lab calibration study, the date on calibration is "3-12-2020"(current date) as per the frequency the next date is calculated as ""3-18-2020"
9. Cross verify Last study date is "3-9-2020" and the Next due date is "3-15-2020"

MODULES:
MSAPRO
Build Cycle:
Cycle 10
Customer:
TSC and Husco
Issue Dependency:
SP925.3
Dev Commitment to Resolve in::

Description

Subtract date (Disabled) -* Server date is Central time and the Client IST*

Gage-->(External Lab)--> When selecting the frequency as "8" days and the Due is 3-13-2020. When conducting the external lab calibration, the date on calibration given as "3-12-2020"(current date) as per the frequency the next date is calculated as "3-20-2020". When tries to verify this date in Gage screen, it displays like

Last study date as "3-10-*2020" and the Next due date as "3-18-2020"

Subtract date(Enabled)

Gage-->(External Lab)--> When selecting the frequency as "7" days and the due is 11-3-2020. When conducting the external lab calibration study, the date on calibration is "3-12-2020"(current date) as per the frequency the next date is calculated as ""3-18-2020". When tries to verify this date in Gage screen, it displays like

Last study date is "3-9-2020" and the Next due date is "3-15-2020"

Actions #1

Updated by Smitha V about 5 years ago

  • Status changed from New to Open
Actions #2

Updated by Prabhu P about 5 years ago

  • Status changed from Open to Resolved
Actions #3

Updated by Kiruthika G about 5 years ago

  • Status changed from Resolved to Yet to Verify
Actions #4

Updated by Kiruthika G about 5 years ago

  • Status changed from Yet to Verify to Closed
Actions

Also available in: Atom PDF