Project

General

Profile

Actions

Bug #15457

closed

Multi Site : Production scheduling : Operations added in Site A for a PI is displaying by default if the same PI is scheduled in Site 2

Added by Anonymous over 5 years ago. Updated over 5 years ago.

Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
01/10/2020
Due date:
% Done:

100%

Estimated time:
Steps To Reproduce:

1.Go to IC
2.Create Inprocess schedule in Site A as given in description
3.Perform Inspection
4.Create Inprocess schedule in Site B as given in description
5.Go to Dept worksheet in Site 2
6.Click on PI
7.Schedule created in Site 1 is displayed by-default

MODULES:
IC
Build Cycle:
Cycle 3
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

Multi Site : Production scheduling : Operations added in Site A for a PI is displaying by default if the same PI is scheduled in Site 2
If the scheduke is deleted form Site 2,its getting deleted form site 1 also

Site 1
Production Inprocess : HVAC
Production Scheduling :Spacers

Site 2
Production Inprocess : Spacers
Production Scheduling :HVAC

In site 2 for HVAC operations are not lising in the pop-up


Files

925_015.png (62.1 KB) 925_015.png Anonymous, 01/10/2020 03:33 PM
925_016.png (59.1 KB) 925_016.png Anonymous, 01/10/2020 03:36 PM
Actions #1

Updated by Anonymous over 5 years ago

  • Status changed from New to Open
  • Assignee changed from Anonymous to Anonymous
Actions #2

Updated by Anonymous over 5 years ago

  • Status changed from Open to In Progress
Actions #3

Updated by Anonymous over 5 years ago

  • Status changed from In Progress to Resolved
Actions #4

Updated by Anonymous over 5 years ago

  • % Done changed from 0 to 100
Actions #5

Updated by Anonymous over 5 years ago

  • Status changed from Resolved to Fixed with Hotfix
Actions #6

Updated by Anonymous over 5 years ago

  • Status changed from Fixed with Hotfix to Closed
Actions

Also available in: Atom PDF