Actions
Bug #15151
closedReceiving/Final Inspection Sheet : Inspection sheet is not loading if Multi-Operation reqd is unchecked in IC settings
Status:
Closed
Priority:
High
Assignee:
-
Start date:
11/27/2019
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1.Go to IC
2.Click on IC settings
3.Disable Multi-operation reqd
4.Click on Receiving Inspection
5.Click on submit button in Inspection entry pop-up after filling the mandatory details
6.Observe result
MODULES:
IC
Build Cycle:
Cycle 3
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
Description
Receiving/Final Inspection Sheet : Inspection sheet is not loading if Multi-Operation reqd is unchecked in IC settings
Actions