Project

General

Profile

Activity

From 07/15/2019 to 08/13/2019

08/13/2019

07:04 PM Flexibility& Efficiency of use #13672 (Open): Actions : Show the count in the icon itself (Action item count )
Actions : Show the count in the icon itself (Action item count ) Ragavi Ram
06:48 PM Flexibility& Efficiency of use #13671 (Open): Audit schedule:Plan Audit: I have selected one user as Lead auditor, but in plan audit it shows 2 users why??
Audit schedule:Plan Audit: I have selected one user as Lead auditor, but in plan audit it shows 2 users why?? Anonymous
06:44 PM Flexibility& Efficiency of use #13670 (Open): Audit schedule:Why am seeing 2 audit programs? On what basis its showing the audit program??
Anonymous
06:20 PM Meaningful Text & Messages #13668 (Open): Import Checklist: Error is not user friendly. No need of save button
Import Checklist: Error is not user friendly. No need of save button Anonymous
06:13 PM Visibility of system status #13667 (Open): Findings category:Why am seeing the other audit programs category??I cant edit the audit program
Findings category:Why am seeing the other audit programs category??I cant edit the audit program Anonymous
05:57 PM Consistency and standards #13665 (Open): Findings category: Show all button needs to be aligned
Findings category: Show all button needs to be aligned Anonymous
05:41 PM Consistency and standards #13664 (Open): Audit Program: Map entity: Right click:Contact person should be plural since allowed the user to select multiple users.Need space b/w re and upload in reupload approvers text. If more users are added, on what basis its showing the user name in text box
1.Audit Program: Map entity: Right click:Contact person should be plural since allowed the user to select multiple us... Anonymous
05:24 PM Consistency and standards #13663 (Open): Audit Program: Map entity: The created audit program is not displayed fully in the table
Audit Program: Map entity: The created audit program is not displayed fully in the table Anonymous
05:20 PM Consistency and standards #13662 (Open): Audit Program: Audit form→When the doc is attached from doc pro by expanding levels, done button and cancel button is not displayed
Audit Program: Audit form→When the doc is attached from doc pro by expanding levels, done button and cancel button is... Anonymous
05:18 PM Flexibility& Efficiency of use #13661 (Open): Audit Program: Assign Audit types and forms:Couldn't understand the behaviour. Sometimes cant able to edit the audit form.sometimes its working sometimes its not
1.Audit Program: Assign Audit types and forms:Create a one form with form type as template
2.Then when creating anot...
Anonymous
04:47 PM Visibility of system status #13660 (Open): Audit mode: Showing 2 sites in the dropdown even the user has access rights only for one site
Audit mode: Showing 2 sites in the dropdown even the user has access rights only for one site Anonymous
02:20 PM Visibility of system status #13657 (Open): Audit Program:Finding category: Response time label needs frequency whether its in days/weeks/months
Audit Program:Finding category: Response time label needs frequency whether its in days/weeks/months Anonymous
02:16 PM Intuition #13656 (Open): Audit Schedule:I have created one audit program but when I schedule my audit program is not listed. For that some settings needs to be done before it seems. As a user how I knows that???Better to have all the presetup in single screen
Audit Schedule:I have created one audit program but when I schedule my audit program is not listed. For that some set... Anonymous
02:14 PM Flexibility& Efficiency of use #13655 (Open): Audit Program:Findings category grid:When I enter wrong details and save, it throws an alert message, after that all the data which have entered are cancelled and the user has to enter from the beginning(Common for all the modules)
Findings category grid:When I enter wrong details and save, it throws an alert message, after that all the data which... Anonymous
02:13 PM Consistency and standards #13654 (Open): Common:All the alert message headings should be common across Ewqims
Anonymous
02:12 PM Flexibility& Efficiency of use #13653 (Open): Layers:How to create a new layer??? The user needs to navigate to last page to create another layer. Unnecessary space in the RHS By defualt it shows layout for 3 layers, Why its needed???Whatif if I want to have only one layer
Layers:How to create a new layer??? The user needs to navigate to last page to create another layer. Unnecessary spac... Anonymous
02:12 PM Consistency and standards #13652 (Open): Layers:Teams popup→Done button should be on the top . In some screens its in top and in some screens its in bottom
Layers:Teams popup→Done button should be on the top . In some screens its in top and in some screens its in bottom Anonymous
02:12 PM Visibility of system status #13651 (Open): Layers:Teams are not searched in the popup. Enter key is not working for search
Layers:Teams are not searched in the popup. Enter key is not working for search Anonymous
02:11 PM Consistency and standards #13650 (Open): Layers:Heading is wrong when clicking on add team icon
Anonymous
02:11 PM Consistency and standards #13649 (Open): Layers:•The selected team should be checked in the team popup before saving
•The selected team should be checked in the team popup before saving Anonymous
02:10 PM Consistency and standards #13648 (Open): Checklist:•In All places checklist doesn’t have spaces, Inport check list button has space •Need space between NewTeam text
•In All places checklist doesn’t have spaces, Inport check list button has space
•Need space between NewTeam text
Anonymous
02:10 PM Visibility of system status #13647 (Open): Layers:Where am I selecting the route, Why I cant edit the route selection
Layers:Where am I selecting the route, Why I cant edit the route selection Anonymous
02:09 PM Consistency and standards #13646 (Open): Layers:•Pagination tab is not unique •All the popups are looking odd (same for audit program clauses)
•Pagination tab is not unique
•All the popups are looking odd
Anonymous
02:08 PM Consistency and standards #13645 (Open): Layers:•Team column→should not allow the user to edit the Team name •Better to show the team leader as responsible person
Layers:•Team column→should not allow the user to edit the Team name •Better to show the team leader as responsible ... Anonymous
02:06 PM Visibility of system status #13644 (Open): Don’t know what is the purpose of escalation routes icon. Nothing happened when clicked on that When clicking on first time, the max and close button goes up and I Need to scroll up and close the popup
Don’t know what is the purpose of escalation routes icon. Nothing happened when clicked on that
When clicking on fir...
Anonymous
12:49 PM User Interface Aesthetic #13643 (Open): My Deliverable - Icon for viewing the legends can be more specific . Not visible and its clumsy.
My Deliverable - Icon for viewing the legends can be more specific . Not visible and its clumsy. Ragavi Ram
12:47 PM User Interface Aesthetic #13642 (Open): My Deliverable - Document viewer (Task attachment) Fonts - Phase can be in bold
My Deliverable - Document viewer (Task attachment) Fonts - Phase can be in bold Ragavi Ram
12:37 PM Consistency and standards #13641 (Open): •Document viewer (Task attachment)- while attaching the document and on selecting the " Is output document as NO still the O/P doc attachment option is enabled. Also the alignment is not good • Attach document - Alignment
•Document viewer (Task attachment)- while attaching the document and on selecting the " Is output document as NO st... Ragavi Ram
12:29 PM Consistency and standards #13640 (Open): My Deliverable - Document viewer (Task attachment) - screen design is not clear ( Spacing , Design )
My Deliverable - Document viewer (Task attachment) - screen design is not clear ( Spacing , Design ) Ragavi Ram
12:25 PM Consistency and standards #13639 (Open): Loading symbol varies
Loading symbol varies Ragavi Ram
12:16 PM Flexibility& Efficiency of use #13638 (Open): Project creation - Add new resource(User popup) - Can list only the user having Calendar and My deliverable rights .
Project creation - Add new resource(User popup) - Can list only the user having Calendar and My deliverable rights . Ragavi Ram
12:15 PM User Interface Aesthetic #13637 (Open): Menu Icons (Common) - Menus icons - Placing the mouse hoer the icon can give a bounce effect
Menu Icons (Common) - Menus icons - Placing the mouse hoer the icon can give a bounce effect Ragavi Ram
12:13 PM User Friendly Error Message #13636 (Open): Project creation - Why there is right click option pop up in all the fields( wherever I click Im getting those options) . Also the right click option can sort the list.
Ragavi Ram
12:11 PM User Friendly Error Message #13635 (Open): Mandatory fields can be indicate through *. The alert displays only after the entering all the fields and clicking on save .
Mandatory fields can be indicate through *. The alert displays only after the entering all the fields and clicking on... Ragavi Ram
12:08 PM Help and documentation #13633 (Open): Landing screen - Instead of displaying the image it can be a video clip / motion picture of the module .
Landing screen - Instead of displaying the image it can be a video clip / motion picture of the module . Ragavi Ram
12:07 PM Visibility of system status #13632 (Open): Set up (Common)- Groups - can rename Access rights / User role editor / Assign user access / Control access / Assign Roles
Set up (Common)- Groups - can rename Access rights / User role editor / Assign user access / Control access / Assign ... Ragavi Ram
12:06 PM User Interface Aesthetic #13631 (Open): Projects Creation- Can sort the menus listing in Deliverable screen (Refer Screenshot)
Projects Creation- Can sort the menus listing in Deliverable screen Ragavi Ram
12:01 PM Flexibility& Efficiency of use #13630 (Open): Projects Creation- Can include the Previous / Next link to view the projects created by the Project manager. by clicking on Previous or Next he can view the deliverable directly from the deliverable creation screens of the previous or the future records.
Can include the Previous / Next link to view the projects created by the Project manager. by clicking on Previous or ... Ragavi Ram
12:00 PM Flexibility& Efficiency of use #13629 (Open): Projects Creation- Need tool tip(Hint) for the menus in the deliverable creation row headers. eg. Duration (UOM , Whether its in Days/Time)
Projects Creation- Need tool tip(Hint) for the menus in the deliverable creation row headers. eg. Duration (UOM , Wh... Ragavi Ram
11:46 AM Flexibility& Efficiency of use #13627 (Open): Project Creation - Can intimate the user can scroll by highlighting the scroll bar in the bottom.
Project Creation - Can intimate the user can scroll by highlighting the scroll bar in the bottom. Ragavi Ram
11:43 AM Visibility of system status #13626 (Open): While logging in as Project manager for the first time our system can guide the user to the process flow by giving guidance tour.
While logging in as Project manager for the first time our system can guide the user to the process flow by giving g... Ragavi Ram

08/08/2019

06:11 PM Visibility of system status #13611 (Open): Part Equipmet mapping ->This needs parts to be listed so that mapping able to do against with equipment.But parts details creation/importing in main menu which is displaying not in order.
Part Equipmet mapping ->This needs parts to be listed so that mapping able to do against with equipment.But parts det... Saradha Balan
06:10 PM Visibility of system status #13610 (Open): Acceptance Quality Limit->Acceptance,rejetion value set up against with quality level standard value mapping is difficult to understand
Acceptance Quality Limit->Acceptance,rejetion value set up against with quality level standard value mapping is diffi... Saradha Balan
06:09 PM Flexibility& Efficiency of use #13609 (Open): Acceptance Quality Limit ->two scroll bars gets confused .able to see the pre set up data by using main scroll bar instead of respective grid scroll bar
Acceptance Quality Limit ->two scroll bars gets confused .able to see the pre set up data by using main scroll bar in... Saradha Balan
06:08 PM Flexibility& Efficiency of use #13608 (Open): Part Equipment mapping tree->Should need horizontal scroll bar,Alignment issue in selecting inspecter, Done button is not user friendly/easy viewable in the inspector selection screen
Part Equipment mapping tree->Should need horizontal scroll bar,Alignment issue in selecting inspecter, Done button is... Saradha Balan
06:06 PM Consistency and standards #13607 (Open): Part Equipment mapping->The "label" usage is confusing.
Saradha Balan
06:05 PM Flexibility& Efficiency of use #13606 (Open): Common issue-> Add,edit,delete,search, and save button usage is too complex.
Common issue-> Add,edit,delete,search, and save button use
sometimes while saving,done button also enable .
Saradha Balan
06:04 PM Flexibility& Efficiency of use #13605 (Open): Activity master->Every time on adding application prompting to add or not. This to be auto added
Activity master->Every time on adding application prompting to add or not. This to be auto added
Saradha Balan
06:04 PM Consistency and standards #13604 (Open): While saving activity master->no need done while saving. Its confusing
While saving activity master->no need done while saving. Its confusing
Saradha Balan
06:04 PM Flexibility& Efficiency of use #13603 (Open): IC Settings menu->alignment is not proper. Page is very clumsy
IC Settings menu->alignment is not proper. Page is very clumsy
Saradha Balan
06:03 PM Consistency and standards #13602 (Open): Common issue-> eg,Defect phenomenon->Search label can greyed in the text box, confusing to add /search
Common issue-> eg,Defect phenomenon->Search label can greyed in the text box, confusing to add /search
Saradha Balan
06:02 PM Consistency and standards #13601 (Open): Equipment Attachment->->Attach and Upload single button and delete button (two buttons) enough for uploading and deleting
Equipment Attachment->->Attach and Upload single button and delete button (two buttons) enough for uploading and dele... Saradha Balan
06:02 PM Consistency and standards #13600 (Open): Equipment Attachment->Cancel upload option is no needed if delete files option available.
Equipment Attachment->Cancel upload option is no needed if delete files option available.
Saradha Balan
06:01 PM Visibility of system status #13599 (Open): Equipment Attachment->Cancel upload option is no needed if delete files option available.
Equipment Attachment->Cancel upload option is no needed if delete files option available.
Saradha Balan
05:04 PM Consistency and standards #13595 (Open): Customise email messages:No need of 2 scroll bars
No need of 2 scroll bars Anonymous
 

Also available in: Atom