Apply Clear
1.Login as AQuA Pro Module Administrator
2.Click on AQuA Pro Tab and click on Main Menu
3.Expand the Global PI and select the PI
4.Click on Design Documents Menu and click on AIAG VDA DFMEA, (A new tab will open)
5.Click on Process VDA menu icon and Select Failure Analysis
6.Do Failure Flowdown/FlowUp for Item Elements
7.Refresh the page
8.Now remove allocation for any item elements
9.Observe the page
10.Refresh the page and observe the Elements
11.System displays all the elements
1. Login EwQIMS as TPM Module Administrator2. Click on Plant configuration menu3. Click on import attach a file4. Click on Equipment menu5. Click on Import button6. Attach a file7. Click on PM Supervisor Calendar8. Click on Assign PM
1. Login EwQIMS as Multi site access2. Select Site 13. Import the spare part master4. Click on Unit of measurement '5. Observe the data6. Click on corporate site7. Observe the data
5.Click on Design VDA menu icon and Select Failure Analysis
6.Right click on the existing cause and add values for Risk and Optimization
7.Now select Result & Documentation and Observe the "The overall risk reduced as follows" table
1. Login as Social TPM module administrator2. Observe the Planned maintenance list and extract icon pop up window
1. Login Social Media as TPM Module Administrator2. Observe the UBM, CBM, PR, Autonomous and adhoc wo time
1. Login EwQIMS as TPM Module Administrator2. Click on PM/BD3. Click on Spare part usage Icon4. Select the Item and click on save button
Also available in: Atom CSV PDF
Selected Columns All Columns
Encoding ISO-8859-1 UTF-8
Cancel