Bug #30177

Updated by Kirubakaran chandran 2 months ago

 	
 1. Login as AQuA Pro Module Administrator 
 2. Click on the Products Tab and select Design VDA Menu. 
 3. select the Function Failure Analysis menu 
 4. Select a Production Item 
 5. (Tree View) Right Click click on Focus BOM and select Make a child 
 6. Uncheck the parent BOM direct cause or Flowdown Failure 
 7. Select the child BOM Risk  
 8.Add a new Preventive control/Detective Control 
 8. Click 9. click on ok 
 9. 10. Open Main2 page 
 11. Select the same PI 
 12. Open Action Master table 
 13. Observe the result