Actions
Usability #5540
openDesign VDA: In Failure Analysis, Without adding the Failure in System then if try to add failure in Sub system, then some alert should display
Status:
Suggestion
Priority:
Low
Assignee:
-
Start date:
04/26/2018
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
1.Select a Production item
2.Click on Design VDA tab
3.Select Failure Analysis do the flow down from System to Subsystem and make sure there is no failure added in System
MODULES:
VDA
Build Cycle:
Cycle 7
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
No data to display
Actions