Project

General

Profile

Actions

Unit Level and Cosmetic Issues #4848

closed

Inspection Plans Menu: Want to Change the Name as Inspection Sheet instead of Production Trackingsheet

Added by Anonymous about 7 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
02/23/2018
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1.Goto EwQIMS
2.Login as IC Module User
3.Navigate to IC Module
4.Goto Actions Tab and Click on Inspection Plans Menu
5.Select the Inprocess Inspection Calendar option
6.Observe the Results

MODULES:
IC
Build Cycle:
Cycle 4
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

In Inspection Plans Menu, For the Selection Inprocess Inspection Calendar its showing the option as Production Trackingsheet but it should be in Inspection Sheet


Files

Actions #1

Updated by Smitha V about 7 years ago

  • Status changed from New to Open
Actions #2

Updated by Anonymous about 7 years ago

  • Status changed from Open to Resolved
Actions #3

Updated by Anonymous about 7 years ago

  • Status changed from Resolved to Closed

This Issue was Verified in Cycle-5 and the Issue was Fixed so the QA Team is Closing this Issue.

Actions

Also available in: Atom PDF