Project

General

Profile

Actions

Bug #3757

closed

Production TrackingSheet Menu: While Rejecting the 2nd Characteistic Sample by giving "NOK"automatically the 1st Characteristic Accepted Sample "OK" was changing into "NOK"

Added by Anonymous over 7 years ago. Updated over 7 years ago.

Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
01/03/2018
Due date:
% Done:

100%

Estimated time:
(Total: 0:00 h)
Steps To Reproduce:

1.Goto EwQIMS
2.Login as IC Module User
3.Navigate to IC Module
4.Goto Actions Tab and Click on Production TrackingSheet Menu
5.Select the Assigned Inspection Entry
6.Now Enter the Lot No. and Click Submit Button
7.After Submitting the Lot No. continue the Inspection
8.Now Accept the sample for 1st Characteristic, give the Date and then Reject the 2nd Characteristic
9.Observe the Results

MODULES:
IC
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

In Production TrackingSheet Menu, by giving the "NOK" for the Samples automatically the "OK" samples was changing into "NOK but the Color was in Green only" and also the date was hiding


Files


Subtasks 1 (0 open1 closed)

Bug #3772: Production TrackingSheet Menu: While Rejecting the 2nd Characteristic Sample the Characteristics was getting changedClosed01/03/2018

Actions
Actions #1

Updated by User Admin over 7 years ago

  • Status changed from New to Open
Actions #2

Updated by Anonymous over 7 years ago

  • Status changed from Open to Resolved
Actions #3

Updated by Anonymous over 7 years ago

  • Status changed from Resolved to Closed

This Issue was Closing on Cycle-2

Actions

Also available in: Atom PDF