EMAIL- Due and pending reminder email is not generating as per the frequency set up

Added by malini C 4 months ago. Updated 11 days ago.

Status:
In Progress
Priority:
Low
Assignee:
Start date:
12/19/2024
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1)Login into EWQIMS application as Project Manager
2)Select APQP module
3)Enable the emails
4) Navigate to project
5) Assign resource and publish/baseline the project

1) Login as PM
2) Navigate to project Gantt page
3) Navigate to route icon
4) Click on Escalation route
5) Deselect existing route

Scenario: Setup holidays for 2 different years, the holiday set for one year is applicable to the next

MODULES:
SUITE
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

EMAIL- Due and pending reminder email is not generating as per the frequency set up. System is considering only after days frequency from the current date not based on the project plan schedule start date.

Reminder email is showing wrong after days (if Holiday is set for anotherlineitem)

Not allowing to deselect route from the APQP Escalation mail page

Actions #1

Updated by User Admin 4 months ago

  • Status changed from New to Open
Actions #2

Updated by Raghu Ram 4 months ago

  • Status changed from Open to Resolved
Actions #3

Updated by malini C 3 months ago

  • Description updated (diff)
Actions #4

Updated by malini C 3 months ago

  • Status changed from Resolved to Not Resolved

EMAIL- Due and pending reminder email is not generating as per the frequency set up. System is considering only after days frequency from the current date not based on the project plan schedule start date. FIXED

Reminder email is showing wrong after days (if Holiday is set for anotherline item)- Not Fixed(moving to next version)

Not allowing to deselect route from the APQP Escalation mail page - Fixed

Actions #5

Updated by malini C 3 months ago

  • Steps To Reproduce updated (diff)
Actions #6

Updated by Raghu Ram 3 months ago

  • Status changed from Not Resolved to Resolved
Actions #7

Updated by malini C 3 months ago

  • Status changed from Resolved to Not Resolved
Actions #8

Updated by Raghu Ram 3 months ago

  • Status changed from Not Resolved to In Progress
Actions #9

Updated by User Admin about 2 months ago

  • Priority changed from High to Low
  • How do we missed in Testing ? set to status changed from high to low
Actions #10

Updated by malini C 11 days ago

  • Project changed from SP 11.3.2 to SP 11.3.2.2 Patches
  • How do we missed in Testing ? deleted (status changed from high to low)