Bug #29597
closedThe Line Text does not overlap or interfere with adjacent operations (e.g., Operation 10 and Operation 20) and The Line Text and Line Color do not overlap in the Export to PDF format.
0%
1.Login as AQuAPro Module User/Admin
2.Click on Products
3.Expand AQuAPro Menu
4.Click on Main2
5.Expand Global -> Select any one Production Item
6.Open the PFD document
7.Right click on operation number cell (Ex: operation 10)
8.Click on Open document option
9.Click the Process Flow Information option
10.Click the Ok button
11.Insert the Branch (By using keys as Ctrl+insert)
12.Right Click on Newly inserted branch
13.Click the Insert branch option (insert the more than 10 branch)
14.Select the differnt operation
15.Select the text in 'Line Colour' field
16.Select the text in 'Line Colour' field
17.Open the Process Flow document
18.User can view the Line Text and Line Colour
19.Observe the Result
Description
1.The Line Text does not overlap or interfere with adjacent operations (e.g., Operation 10 and Operation 20),
2.The Line Text and Line Color do not overlap in the Export to PDF format.
Test Case ID
https://testlink.ewqims.net/ltx.php?item=exec&feature_id=56016&build_id=56
https://testlink.ewqims.net/ltx.php?item=exec&feature_id=56018&build_id=56
Files
Updated by User Admin 5 months ago
- Project changed from SP 11.2.0.17 Patches to SP 11.2.0.18 Patches
- Issue Dependency set to Moved from 11.2.0.17
Updated by Kirubakaran chandran 5 days ago
- Status changed from Resolved to Closed
Issue verified in SP 11.3.2.2 and closed