Actions
Bug #23215
closedCalval Report : Report design issues
Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
10/01/2021
Due date:
% Done:
0%
Estimated time:
Steps To Reproduce:
Refer Description
MODULES:
IC
Build Cycle:
Cycle 1
Customer:
Husco
Issue Dependency:
IMPCAT Area If any ::
Impcat Verifed:
Yes
Description
Rename Calval to Calval Report
Rejection Checklist
Add Lot details
Add Spec and Tolerance details
Signoff details
1st table : Show in descending order
Bring tool-tip Operation tool-tip
Space b/n 1st table and 2nd table header
Add operation detail in 3rd table
Bring tool-tip in Signoff details table
Actions