Project

General

Profile

Actions

Bug #23205

closed

If Same PI is scheduled for multiple dates, lot number entered in previous schedule is showing by default and it is opening the existing inspection sheet

Added by Anonymous over 3 years ago. Updated over 3 years ago.

Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
10/01/2021
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1.Create a PI schedule for a date
2.Perform Inspection
3.Now schedule inspection for the same PI for another date
4.Observe by-default it will show the last entered lot number and it is opening the existing inspection sheet

MODULES:
IC
Build Cycle:
Cycle 1
Customer:
Husco
Issue Dependency:
IMPCAT Area If any ::
Impcat Verifed:
Yes

Description

If Same PI is scheduled for multiple dates, lot number entered in previous schedule is showing by default and it is opening the existing inspection sheet

Actions #1

Updated by Anonymous over 3 years ago

  • Status changed from New to Open
Actions #2

Updated by Anonymous over 3 years ago

  • Status changed from Open to Fixed in Dev
Actions #3

Updated by Anonymous over 3 years ago

  • Status changed from Fixed in Dev to Resolved
Actions #4

Updated by Anonymous over 3 years ago

  • Status changed from Resolved to Closed
Actions

Also available in: Atom PDF