Project

General

Profile

Actions

Bug #2179

closed

Production TrackinSheet: For Changing/Re-Entereing the Lot Size

Added by Anonymous almost 8 years ago. Updated over 7 years ago.

Status:
Closed
Priority:
Low
Assignee:
-
Start date:
07/04/2017
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1.Goto EwQIMS
2.Login as IC Module User
3.Navigate to IC Module
4.Click on Actions Tab and Goto Production TrackingSheet Menu
5.Select the Operations and Enter the Lot No. and also Change the Lot Size
6.Observe the Results

Observation: By Changing the Lot Size there is no Alert Message like the "Reason for Change"

MODULES:
IC
Build Cycle:
Cycle 2
Customer:
Issue Dependency:
Dev Commitment to Resolve in::

Description

When the Lot Size are Changed then Need "Reason for Change" because there is no Alert Message or Pop-Up Message to indicate that the "Lot Size is Changing for this Reason" or else it can say "Can't Change the Lot Size"

Actions #1

Updated by Anonymous almost 8 years ago

  • Status changed from Suggestion to TBD
  • Assignee changed from Anonymous to Anonymous

Operator would change the lot size and if he needs to communicate any information he would enter the information in the Inspection sheet itself. We may not need to force him to type the reason here.

Actions #2

Updated by User Admin almost 8 years ago

  • Priority changed from Medium to Low

Inspector can able to enter the data in the IC sheet so it seems to be not an issue in this case. Need to discuss about this again

Actions #3

Updated by User Admin over 7 years ago

  • Status changed from TBD to Closed

Not an issue

Actions

Also available in: Atom PDF