Actions
Bug #17743
closedIssues regarding Inspection sampling Plan and AQL listing in Inspection entry pop-up
Status:
Closed
Priority:
Medium
Assignee:
-
Start date:
08/05/2020
Due date:
% Done:
100%
Estimated time:
Steps To Reproduce:
1.Go to IC
2.Click on Inspection sampling plan
3.Select existing record and click Edit operation
4.Observe result
MODULES:
IC
Build Cycle:
Cycle 0
Customer:
Issue Dependency:
Dev Commitment to Resolve in::
Description
Issues
1.Acceptance quality limit : By default not showing for Inspection Mode "NORMAL"
2.Inspection sampling plan : Acceptance quality limit showing blank while performing edit operation
3.PI field should be optional while editing
4.Quality level std in Inspection entry pop-up appended with 00.(Eg 0.4 is used in Inspection sampling plan,but in Inspection entry pop-up it will show 0.400)
5.Receiving inspection: Inspection entry popup: AQL are not coming as expected. Its showing the AQL only when the specific part mapping is deleted in Inspection sampling plan
Updated by Anonymous over 4 years ago
- Assignee changed from Anonymous to Anonymous
Updated by Anonymous over 4 years ago
- Status changed from Resolved to Fixed with Hotfix
Updated by Anonymous over 4 years ago
- Status changed from Fixed with Hotfix to Closed
Closed in Cycle 1
Actions