Bug #16440
closedProduction Inprocess : Status should get updated automatically to In-Progress once the Inspection starts
100%
1.Go to IC
2.Click on Production inprocess
3.Click on PI already scheduled
4.Update any operations
5.Click on In-process Inspection menu
6.Observe created date for the Operation
7.Repeat the same for Dept Worksheet
8.Observe date for the PI created in Dept worksheet
Description
Production In-process : Status should get updated automatically to In-Progress once the Inspection starts
In production In-process Menu,if user is updating any operation detail for a PI its date is getting updated in In-process Inspection menu
eg : PI creation date is 1st and operation is added on 2nd.In In-process Inspection menu created date is displayed as 2nd
But in Dept worksheet,operations are also taking the same date as the PI scheduled date
Need to have a common logic
Updated by Anonymous about 5 years ago
- Status changed from Open to Resolved
- % Done changed from 0 to 100
Updated by Anonymous about 5 years ago
- Status changed from Resolved to Fixed with Hotfix
Updated by Anonymous about 5 years ago
- Status changed from Fixed with Hotfix to Closed
Verified and closed in Cy 2