Project

General

Profile

Actions

Bug #10057

closed

US #24363 - Failure Analysis - After adding a Function and Failure in Failure Analysis and then Adding a Requirement, system creates a separate branch Requirement.(Refer Description)

Added by Shankar Narayanan over 6 years ago. Updated over 6 years ago.

Status:
Closed
Priority:
High
Assignee:
-
Start date:
12/03/2018
Due date:
% Done:

0%

Estimated time:
Steps To Reproduce:

1.Login as AQuA Pro Module Administrator
2.Click on AQuA Pro Tab and click on Main Menu
3.Expand the Global PI and select the PI
4.Click on Design Documents Menu and click on AIAG VDA DFMEA, new tab will open
5.Click on AIAG VDA Design tab and click on Failure Analysis
6.Add Function and Failure
7.Now add Requirement and Reload the page
8.Observe the result

MODULES:
VDA
Build Cycle:
Cycle 1
Customer:
Issue Dependency:
IMPCAT Area If any ::
Impcat Verifed:

Description

Add Function to a PI and then Add Failure. Now add Requirement and Refresh the Page. Here System creates a different branches for failure and Requirement.

After adding a Function and Failure in Failure Analysis and then Adding a Requirement, system creates a separate branch Requirement.(Refer Description)


Files

2018-12-03 ADD fAILURE.png (47.9 KB) 2018-12-03 ADD fAILURE.png Shankar Narayanan, 12/03/2018 03:45 PM
2018-12-03 Add Requirement.png (53.7 KB) 2018-12-03 Add Requirement.png Shankar Narayanan, 12/03/2018 03:45 PM
2018-12-03 TABLE VIEW.png (53.8 KB) 2018-12-03 TABLE VIEW.png Shankar Narayanan, 12/03/2018 03:46 PM
Actions #2

Updated by User Admin over 6 years ago

  • Status changed from New to Open
Actions #3

Updated by Reng Raj over 6 years ago

  • Status changed from Open to Resolved
Actions #4

Updated by Shankar Narayanan over 6 years ago

  • Status changed from Resolved to Fixed with Hotfix
Actions #5

Updated by Shankar Narayanan over 6 years ago

  • Status changed from Fixed with Hotfix to Resolved
Actions #6

Updated by Shankar Narayanan over 6 years ago

  • Status changed from Resolved to Closed

Closed in SP820 on 17-12-2018

Actions

Also available in: Atom PDF