 ENGINEERING CHANGE REQUEST FORM 
 
 
Requester Details
Requested By:N Ramya ECR Number:ECR/2019101415
Employee Code:QA23Site:Corporate
Job PositionUserEntity:Corporate
Change Details
Change Title:Suite change 1 
Project Name: If others specify: 
Requested Date:10/14/2019 12:46:54Proposed Closure Request Date:10/31/2019
Part Name:M and H Flange Plate 1If others specify 
Change Description
Change Category:Date Change
Type of Change: 
Major Change (Class A) ( Production line cannot run without sign off)
Major Change (Class B) ( Production line can run after QC Associate has verified the parts are within specification. RFC form can then be circulated for approval. )
Minor Change (Class C) ( Production line can run if dimensions are within specification. RFC form can be submitted with the first off part to QC.)
Reason:  
Area of change:  
Benefits of Change:
Capacity    
Customer Satisfaction    
Improve productivity    
Improve quality    
Prevent defect    
Reduce unit cost    
Technical Development 
Risk Analysis
Select Risk Template:Risk and OpportunityView Risk
Dimensions(if required)
Capability    
Compactibility    
Critical Roughness    
ES Test Report    
Overlap study    
Parts layout 
Documents to change
Design Risk Assessment   
Dimensional Reports   
Initial Process Studies   
Measurement System Analysis Studies   
PFMEA   
Process Control Plan   
Process Flow Diagram   
Process Readiness Study   
Production Purchase Order   
Released Production Drawings   
SPRD 
Include other documentsAdd Document
Document NumberDocument NameRevisionResponsible personReason for ChangeAttach Document
4process flow1ethan Andrew R1 andrew 
39_DIMR1Peter Ryan R2 andrew 
        
Customer Notification
Does this change request require customer notification?
If YES, did customer approved the change requested?
YES
NOAttachmentDimensional Results.xls 
Remarks:  
 
Approval Section
ApproversCommentsApproval StatusRejection StatusApproved/Rejected Date
CP Malini Approved the document
10/14/2019
        
Implementation Section
Does this change needs a new project ?
 
Implemented ByMaliniImplementation Date10/30/2019
 

COMMENTS

No comments found

RISK FORM
h
 Risk and Opportunity  
ObjectiveFailure in MeetingEffect of FailureSeverityCauseOccurrenceRisk = Sev x OccRecommended ActionWhoPromised Date
95% on Time with +/- 2 DaysDoes not change and is at 88%Lose Customer ABC40Unacceptable Supplier PPM and Delivery Performance (see alignment chart)6024Identify improvement opportunities for Supply Chain Process (see below)Peter Ryan 10/29/2019


COMMENTS

No comments found